Browse
Search
Agenda - 12-05-2016 - 6-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 12-05-2016 - Regular Mtg.
>
Agenda - 12-05-2016 - 6-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 3:50:18 PM
Creation date
12/2/2016 8:44:10 AM
Metadata
Fields
Template:
BOCC
Date
12/5/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 12-05-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 1 • Preliminary schematic design and space programming; <br /> 2 • Further design work is on hold until the execution of the ground lease amendment; <br /> 3 • Staffing study in progress <br /> 4 <br /> 5 General Schedule of Events <br /> 6 <br /> Activity Estimated Date Range <br /> BOCC: Construction Manager at October-November, 2016 <br /> Risk Award <br /> Schematic and Developmental Fall-Winter, 2016-2017 <br /> Design Preparations with Board and <br /> Stakeholder Review/Feedback <br /> BOCC: Approval of Final Design, Summer-Fall, 2017 <br /> Guaranteed Maximum Price <br /> Permitting, State Review, Fall 2017— Summer 2019 <br /> Construction Period (16-20 months) <br /> Occupation Fall-Winter, 2019 <br /> 7 <br /> 8 Jeff Thompson said staff is waiting on the execution of the lease from the State, and <br /> 9 there is a staffing study for the facility that is in progress. <br /> 10 John Roberts said he has contacted the General Counsel for the Department of <br /> 11 Administration with the State, seeking help to move things along, but has received no response. <br /> 12 He said he will call again next week. <br /> 13 Chair McKee said he would contact their Legislative Delegation to try and get this <br /> 14 executed. <br /> 15 Jeff Thompson reviewed the following information: <br /> 16 <br /> 17 Options and General Information to Assist in Board Discussion <br /> Detention Center Detention Center with Detention Center <br /> Only built, co-located Law with LEC <br /> Enforcement Center infrastructure for <br /> (LEC) future co-location <br /> General Facility Current detention Current LEC facility <br /> Information facility information: information: <br /> Original Constructed/renovation <br /> construction: 1925 : 2009 <br /> Capacity: 139 Estimated Project Cost: <br /> Detainees $5MM <br /> Square Footage: Square Footage: <br /> 40,227 20,000 <br /> Area: 1.4 acres <br /> Design Process Yes No No <br /> Currently <br /> Authorized by <br /> BOCC <br /> Schematic Secure 144 bed Detention Center with Detention Center <br /> Characteristics facility with "core" additional with prepared <br /> infrastructure for estimated 12,000- additional site and <br /> 250 bed maximum 18,000 square feet of infrastructure <br /> capacity; LEC space connections for <br />
The URL can be used to link to this page
Your browser does not support the video tag.