Browse
Search
2016-679-E AMS - Warren-Hay Mechanical Contractors, Inc. for SportsPlex locker room system replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-679-E AMS - Warren-Hay Mechanical Contractors, Inc. for SportsPlex locker room system replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:36:05 AM
Creation date
12/1/2016 3:10:45 PM
Metadata
Fields
Template:
Contract
Date
9/30/2016
Contract Starting Date
9/30/2016
Contract Ending Date
1/31/2017
Contract Document Type
Agreement - Construction
Amount
$58,884.00
Document Relationships
R 2016-679-E AMS - Warren-Hay Mechanical Contractors, Inc. for SportsPlex locker room system replacement
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: DlE92A6B-7B87-4B77-835C-0760F73C0C1B <br /> Mechanical Contractors Inc. <br /> Heating and Air Conditioning <br /> P.O. Box 818•Hillsborough,NC 27278 <br /> 919-732-4362 <br /> August 25,2016 <br /> Recreation Factory Partners <br /> Re: Orange County Sports Plex Locker Room System Replacement <br /> PROPOSAL <br /> We hereby submit specifications and estimates for: As noted: <br /> • Provide & install (1) DX Split system to replace existing currently serving <br /> locker rooms; System consists of roof mounted Cabinet air Hander and <br /> 20-Ton remote condensing unit. Reconnecting to all existing power <br /> wiring, controls, control wiring, refrigerant lines, and duct system. <br /> • Provide start-up, required permits, and 1 year general warranty. <br /> We propose hereby to furnish material and labor: $58,884.00 <br /> Payment to be made upon completion. <br /> Acceptance: <br /> Date: <br /> Exclusions/Clarifications: <br /> Replacement system to sit back on existing curb and equipment rails reconnecting to <br /> existing power wiring, disconnects,refrigerant piping, and controls. <br /> Respectfully submitted by:Ron LaPann Commercial Division ron.lanannRwarren-hay.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.