Browse
Search
2016-679-E AMS - Warren-Hay Mechanical Contractors, Inc. for SportsPlex locker room system replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-679-E AMS - Warren-Hay Mechanical Contractors, Inc. for SportsPlex locker room system replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:36:05 AM
Creation date
12/1/2016 3:10:45 PM
Metadata
Fields
Template:
Contract
Date
9/30/2016
Contract Starting Date
9/30/2016
Contract Ending Date
1/31/2017
Contract Document Type
Agreement - Construction
Amount
$58,884.00
Document Relationships
R 2016-679-E AMS - Warren-Hay Mechanical Contractors, Inc. for SportsPlex locker room system replacement
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: DlE92A6B-7B87-4B77-835C-0760F73C0C1B <br /> [Departmental Use Only] <br /> TITLE Sportsplex HVAC Replacement <br /> FY FY2016-2017 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 30th <br /> day of September, 2016, by and between Warren-Hay Mechanical, (hereinafter called the "Contractor"), <br /> and Orange County, a body politic and a political subdivision of the State of North Carolina, (hereinafter <br /> called the "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: • <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by N/A (Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> c. Orange County Sportsplex Locker Room System Replacement proposal dated August 25, <br /> 2016 which fully describes the work to be performed. Such work will hereafter be called <br /> the "Work". <br /> d. Related documents listed under Section 1 above. <br /> Revised 6/16 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.