Browse
Search
2016-669-E AMS - Pickard Roofing Company, Inc. for gutter replacement at Historic Courthouse
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-669-E AMS - Pickard Roofing Company, Inc. for gutter replacement at Historic Courthouse
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:28:42 AM
Creation date
11/29/2016 12:17:06 PM
Metadata
Fields
Template:
Contract
Date
11/11/2016
Contract Starting Date
11/11/2016
Contract Ending Date
12/31/2016
Contract Document Type
Agreement - Construction
Amount
$53,460.77
Document Relationships
2017-137-E AMS - Pickard Roofing Company, Inc. for replacement of fascia and moulding boards at Historic Courthouse
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-669-E AMS - Pickard Roofing Company, Inc. for gutter replacement at Historic Courthouse
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AAB48FBD-7E41-49ED-AF28-FCE317917B07 <br /> Page 2 of 3 <br /> this metal roof at a later date. The snow guards come with all stainless steel fasteners. They are <br /> from Berger manufacturer referenced as RT300 and we recommend the Mill Finish Aluminum <br /> ($24.78 each) <br /> Our price for the above outlined work is as follows: <br /> - Gutter materials: $12,940.00 <br /> - Labor(3men/8days) $10,200.00 <br /> - Scaffolding $16,084.00 <br /> - Fascia allowance $2,500.00 and $18.00 per foot past allowance. <br /> Total for new gutters$41,724.00 <br /> - Optional new LCC downspouts $4,760.00 <br /> - Optional RT300 Snow Guards $2,230.00 if installed at the same time of gutter <br /> replacement. If installed at a later date, one day of labor($900.00)will be added to <br /> this number. <br /> Addendum for 3 outbuildings and Visitor Center: <br /> Visitor center: <br /> - Realign gutters and repair downspouts as needed to coincide with newly aligned gutters. <br /> Outbuilding#1 (Dickerson Farm Office): <br /> - Add 5" copper gutter and 3" copper downspout to the rear of the building. <br /> - Repair the existing front gutter and downspout as necessary. <br /> Outbuilding#2 (Public Restrooms): <br /> - Install new 5" copper gutter and 3"downspouts at the front and rear of the building. <br /> Outbuilding#3 (Cadwallader/Jones Law Office): <br /> - Install new 5" copper gutter and 3"downspout on the south side and adjust and repair the <br /> existing one on the North side as required. <br /> Our Price for the above mentioned addendum is as follow: <br /> - LABOR: $2,700.00 <br /> - MATERIALS: $1903.97+TAX $142.80 =$2046.77 <br /> TOTAL for the addendum is: $4,746.77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.