Browse
Search
2016-669-E AMS - Pickard Roofing Company, Inc. for gutter replacement at Historic Courthouse
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-669-E AMS - Pickard Roofing Company, Inc. for gutter replacement at Historic Courthouse
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:28:42 AM
Creation date
11/29/2016 12:17:06 PM
Metadata
Fields
Template:
Contract
Date
11/11/2016
Contract Starting Date
11/11/2016
Contract Ending Date
12/31/2016
Contract Document Type
Agreement - Construction
Amount
$53,460.77
Document Relationships
2017-137-E AMS - Pickard Roofing Company, Inc. for replacement of fascia and moulding boards at Historic Courthouse
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-669-E AMS - Pickard Roofing Company, Inc. for gutter replacement at Historic Courthouse
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AAB48FBD-7E41-49ED-AF28-FCE317917B07 <br /> Page 1 of 3 <br /> PICkARb <br /> ROOFING COMPANY, INC. <br /> October 31, 2016 <br /> Orange County Asset Management Services <br /> Angel Barnes <br /> 131 West Margaret Lane <br /> Hillsborough,NC 27278 <br /> REF: Orange County Historic Courthouse Gutter replacement. <br /> Dear Angel, <br /> Pickard Roofing has made a visual inspection from the ground, then with a manlift regarding the <br /> existing 6"half-round gutters (2 - 80' sides). Below are the details for replacing both gutters and <br /> an option to replace the current downspouts (highly recommended) as well as installing Berger <br /> (RT Series) snow guards on the edge of the roof(45pc for each side). <br /> Set up equipment, scaffolding,hoisting devices and any safety devices necessary to complete the <br /> work outlined below. The scaffolding will be rented from Associated Scaffolding Company. One <br /> side of the building will be entirely set up, and once the work is completed on said side, <br /> Associated Scaffolding Company will come back and move the scaffolding to the other side. <br /> Remove existing gutters, hangers and all (if any) rotten fascia behind and haul away. Please <br /> have an allowance of$2,500 for all damaged fascia replacement with a cost of$18.00 per <br /> foot for anything in excess to this allowance in addition to this contract as it is currently <br /> impossible to predict how much damaged wood is present. <br /> The new 16oz lead coated copper 6"half-round gutters will be installed with new copper shank <br /> and circles with all brass fasteners (nuts and bolts) and attached to the building with stainless <br /> steel screws. <br /> Optional new 4"round lead coated copper(LCC) downspouts are recommended but not <br /> mandatory. Should you want to replace the downspouts, we will install them at the same <br /> locations and connect them to the underground pipes. This is priced separately. <br /> We also recommend installing snow guards on this building. Those snow guards, due to the <br /> double lock standing seam roof system,will be installed on the standing seam to prevent any <br /> fasteners from penetrating the metal roof. They will also be reusable in case you need to replace <br />
The URL can be used to link to this page
Your browser does not support the video tag.