Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 1.06 Manufacturer's Certificates <br /> A. Submit a statement from the manufacturer of the roof system bid stating that the roofing <br /> Contractor is an authorized applicator of the proposed roof system and, subject to the <br /> Owner's award of the construction contract, is authorized to install said system on this <br /> proj ect. <br /> B. Submit a copy of the licensed applicator agreement. <br /> C. If any membrane components are not packaged by the membrane manufacturer, submit a <br /> letter from the membrane manufacturer clearly identifying the component and <br /> acknowledging approval to use the component on the project. <br /> 1.07 Samples <br /> A. Samples shall be of the exact item proposed to be furnished. <br /> B. Unless otherwise specified two samples of each item shall be submitted. <br /> C. Whenever a choice of color is available for a specified product,accurate color charts shall be <br /> submitted to the Designer for review and selection. <br /> 1.08 Personnel <br /> A. Within seven days of the award of contract, submit the names of superintendent and <br /> foreman,or foremen,proposed for this project. <br /> B. Superintendent named shall remain on the project for its entire duration. Written request <br /> to the Owner shall be required prior to replacement of superintendent. <br /> C. If non-English speaking workmen are employed, the foreman and superintendent shall <br /> be fluent in their language and in English. <br /> D. Superintendent shall be present during any progression of work. <br /> 1.09 Manufacturer Training <br /> Within seven days of the date of Notice to Proceed, submit a letter from the membrane manufacturer <br /> listing the names of those Contractor personnel who will be working on this project and are trained <br /> and qualified to install the system. <br /> 1.10 Insurance Certificates <br /> Submit insurance certificate issued to Owner by Contractor's insurance carrier listing all coverage's <br /> as specified in the Owner's General and Supplementary Conditions. <br /> 1.11 Permits <br /> Provide building permits required by federal, state, or local entity for the construction or demolition <br /> work required during the progress of the Work. If no peimits are required,so state. <br /> 1.12 Safety <br /> Provide a copy of company's safety and fall protection plan for the project. <br /> 16-171 Submittals <br /> 013300.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.