Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> B. Analysis Program: Capable of compiling monetary value of completed and partially <br /> completed activities, of accepting revised completion dates, and recomputation of <br /> scheduled dates and float. <br /> C. Required Sorts: List activities in sorts or groups: <br /> 1. By preceding work item or event number from lowest to highest <br /> 2. By longest float,then in order of early start <br /> 3. By responsibility in order of earliest possible start date <br /> 4. In order of latest allowable start dates <br /> 5. In order of latest allowable finish dates <br /> 6. Contractor's periodic payment request sorted by Schedule of Values listings. <br /> 7. Listing of basic input data generating report <br /> 8. Listing of activities on critical path <br /> PART 3 EXECUTION <br /> 3.01 Construction Schedule <br /> Within seven days after receipt of notice to proceed, complete the analysis described in paragraph <br /> 2.01 of this section in preliminary faun. Meet with the Owner and Designer to review the contents <br /> of the proposed schedule and make all revisions agreed upon. Within three days of joint review, <br /> submit complete diagram and mathematical analysis in accordance with paragraph 1.04.B of this <br /> section. <br /> 3.02 Review and Evaluation <br /> A. Participate in joint review and evaluation of network diagrams and analysis with Designer at <br /> each submittal. <br /> B. Evaluate project status to determine work behind schedule and work ahead of schedule. <br /> C. After review, revise network diagram and analysis incorporating results of review and <br /> resubmit within three days. <br /> 3.03 Periodic Reports-show the following activities. <br /> A. Activities completed during the reporting period. <br /> B. Percentage of work actually completed and scheduled as of the report date. <br /> C. Progress along the critical path in terms of days ahead of or behind schedule dates. <br /> D. If work is behind schedule,a brief report which shows,but is not necessarily limited to: <br /> 1. A description of problem areas,both current and anticipated. <br /> 2. Delaying factors and their impact. <br /> 3. An explanation of corrective actions taken or proposed. <br /> 3.04 Revisions <br /> Make only those revisions to the construction schedule as are approved in advance by the Owner and <br /> Designer. <br /> END OF SECTION <br /> 16-171 Construction Schedule <br /> 013216.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.