Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 1.04 Schedule <br /> A. Within seven days after receipt of Notice to Proceed the Contractor shall submit one <br /> reproducible and two prints of the construction schedule to the Designer. These documents <br /> shall be forwarded to the Designer via a carrier that will guarantee delivery on the next <br /> working day. <br /> B. On the first working day of each month the schedule shall be updated and two prints <br /> submitted to the Owner. <br /> PART 2 PRODUCTS <br /> 2.01 Diagram <br /> A. Graphically show the sequence and interdependence of all activities necessary to complete <br /> the Work and the order in which such activities are to be accomplished as planned by the <br /> Contractor and its project field supervisor in coordination with all subcontractors whose <br /> work is shown on the diagram. Activities shown on the diagram shall include, but are not <br /> necessarily limited to: <br /> 1. Submittals and approvals of shop drawings and samples <br /> 2. Procurement of equipment and materials <br /> 3. Project mobilization <br /> 4. Demolition/Preparation <br /> 5. Construction <br /> 6. Miscellaneous Work <br /> 7. Final clean up <br /> 8. Final inspection <br /> 9. All activities by the Owner which affect progress, required completion dates, or <br /> both,for all and each part of the work. <br /> B. The detail of information shall be such that duration times of activities shall normally range <br /> from one to thirty days. The selection and number of activities shall be subject to approval <br /> by the Owner. <br /> C. Mathematical Analysis: Tabulate each activity of detailed network diagrams, using <br /> calendar dates,and identify for each activity: <br /> 1. Preceding and following event numbers <br /> 2. Activity description <br /> 3. Estimated duration of activity,in maximum 30 day intervals <br /> 4. Earliest start date <br /> 5. Earliest finish date <br /> 6. Actual start date <br /> 7. Actual finish date <br /> 8. Latest start date <br /> 9. Latest finish date <br /> 10. Total and free float; accrue float time to Owner and to Owner's benefit <br /> 11. Monetary value of activity,keyed to Schedule of Values <br /> 12. Percentage of activity completed <br /> 13. Responsibility <br /> 16-17.1 Construction Schedule <br /> 013216.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.