Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 013216 <br /> CONSTRUCTION SCHEDULE <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General and Supplementary Conditions <br /> and other Division 1 specification sections apply to work of this section. <br /> 1.02 Description <br /> A. To assure adequate planning and execution of the work so as to complete the project within <br /> the time period allowed in the contract and to assist the Designer in evaluating progress of <br /> the work. <br /> B. "Day" used throughout the contract shall mean "Consecutive Calendar Days" unless <br /> otherwise stated. <br /> C. "Work day" shall be any weekday, exclusive of Saturdays, Sundays, or a recognized legal <br /> holiday on which weather or other conditions (not under control of the contractor) will <br /> penult construction operations to proceed for not less than 3/4 of a normal work day in the <br /> performance of a controlling item of work. The contractor shall denote such controlling <br /> work items on the critical path schedule to be submitted as a part of this project. Should <br /> such conditions permit operations to proceed for at least 1/2 but less than 3/4 of normal <br /> working hours, 1/2 of a work day shall be counted. Days counted shall exclude Saturdays, <br /> Sundays, and recognized legal holidays the Contractor does not work but will include <br /> Saturdays, Sundays, and recognized legal holidays the Contractor does work. Work days <br /> shall be counted during periods of suspension of work ordered by the Designer except when <br /> the suspension is a result of a violation of terms of the contract. <br /> 1.03 Adherence to Approved Schedule <br /> A. Should any activity not be completed within ten days after the scheduled completion date, <br /> the Owner shall have the right to order the Contractor to expedite completion of the activity <br /> by whatever means the Owner deems appropriate and necessary without additional expense. <br /> B. Should any activity be 30 or more days behind schedule the Owner shall have the right to <br /> complete the activity or to have the activity completed by whatever means the Owner deems <br /> appropriate and necessary. <br /> C. The Owner shall assess a dollar value for the work not completed after the scheduled <br /> completion date and will include this information in the activity report. <br /> D. Failure by the Owner to exercise the option to either order the Contractor to expedite an <br /> activity or to expedite an activity by other means shall not be considered precedent setting <br /> for any other activity(ies). <br /> 16-171 Construction Schedule <br /> 013216.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.