Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 012200 <br /> PROJECT MEETINGS <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental, and Special <br /> Conditions and other Division 1 specification sections apply to work of this section. <br /> 1.02 Description <br /> To provide for an orderly review during progress of the work and to provide for the systematic <br /> discussion of problems that may arise throughout the construction period. <br /> 1.03 Representation <br /> Each Contractor and major Subcontractor shall be represented at every meeting by a responsible <br /> representative member of its organization. The Owner,Designer,and/or its authorized representative <br /> shall also attend. <br /> 1.04 Submittals <br /> A. The proceedings of these meetings shall be recorded by the Contractor. One copy of the <br /> proceedings shall be furnished to the Owner and each required representative. <br /> B. Occasionally the Designer shall conduct a meeting. By conducting and recording the <br /> meeting, it shall not be construed that the Designer is scheduling or coordinating <br /> Contractor's work. <br /> 1.05 Decisions/Interpretations <br /> All decisions and interpretations given by the Designer at project meetings shall be made on behalf <br /> of the Owner and shall be conclusive on each contractor affected. <br /> PART 2 PRODUCTS <br /> Not Used <br /> PART 3 EXECUTION <br /> 3.01 Periodic Project Meetings <br /> A. Project meetings shall be scheduled as agreed to by the Owner's representative,Designer and <br /> Contractor(s)at a Pre-Construction meeting. <br /> B. If a change in schedule is required due to causes beyond the control of the Owner or <br /> Designer,the Designer shall advise each concerned party in advance of such a change., <br /> 3.02 Location-Meetings shall be held at the job site to the maximum extent possible. <br /> 16-171 Project Meetings <br /> 012200.1 <br />