Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 012200 <br /> PROJECT MEETINGS <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental, and Special <br /> Conditions and other Division 1 specification sections apply to work of this section. <br /> 1.02 Description <br /> To provide for an orderly review during progress of the work and to provide for the systematic <br /> discussion of problems that may arise throughout the construction period. <br /> 1.03 Representation <br /> Each Contractor and major Subcontractor shall be represented at every meeting by a responsible <br /> representative member of its organization. The Owner,Designer,and/or its authorized representative <br /> shall also attend. <br /> 1.04 Submittals <br /> A. The proceedings of these meetings shall be recorded by the Contractor. One copy of the <br /> proceedings shall be furnished to the Owner and each required representative. <br /> B. Occasionally the Designer shall conduct a meeting. By conducting and recording the <br /> meeting, it shall not be construed that the Designer is scheduling or coordinating <br /> Contractor's work. <br /> 1.05 Decisions/Interpretations <br /> All decisions and interpretations given by the Designer at project meetings shall be made on behalf <br /> of the Owner and shall be conclusive on each contractor affected. <br /> PART 2 PRODUCTS <br /> Not Used <br /> PART 3 EXECUTION <br /> 3.01 Periodic Project Meetings <br /> A. Project meetings shall be scheduled as agreed to by the Owner's representative,Designer and <br /> Contractor(s)at a Pre-Construction meeting. <br /> B. If a change in schedule is required due to causes beyond the control of the Owner or <br /> Designer,the Designer shall advise each concerned party in advance of such a change., <br /> 3.02 Location-Meetings shall be held at the job site to the maximum extent possible. <br /> 16-171 Project Meetings <br /> 012200.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.