Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5th Wall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> E. Submit with transmittal letter as specified for Submittals in Section 013300, Submittal <br /> Procedures. <br /> F. Substantiating Data: When Designer requires substantiating information, submit data <br /> justifying dollar amounts in question. Include the following with Application for <br /> Payment: <br /> 1. Partial release of liens from major subcontractors and vendors. <br /> 2. Record documents as specified in Section 017700, Project Closeout Procedures, <br /> for review by Owner which will be returned to Contractor. <br /> 3. Affidavits attesting to off-site stored products. <br /> 1.06 Change Procedures <br /> A. Submittals: Submit name of individual authorized to receive change documents, and be <br /> responsible for informing others in Contractor's employ or Subcontractors of changes to <br /> the Work. <br /> B. The Designer will advise of minor changes in the Work not involving adjustment to <br /> Contract Sum or Contract Time by issuing supplemental instructions. <br /> C. The Designer may issue a Proposal Request including a detailed description of proposed <br /> change with supplementary or revised Drawings and specifications, a change in Contract <br /> Time for executing the change and the period of time during which the requested price <br /> will be considered valid. Contractor will prepare and submit estimate within two days. <br /> D. Contractor may propose changes by submitting a request for change to Designer <br /> describing proposed change and its full effect on the Work. Include a statement <br /> describing reason for the change, and effect on Contract Sum and Contract Time with full <br /> documentation. <br /> E. Stipulated Sum Change Order: Based on Proposal Request and Contractor's fixed price <br /> quotation or Contractor's request for Change Order as approved by Designer. <br /> G. Unit Price Change Order: For contract unit prices and quantities, the Change Order will <br /> be executed on fixed unit price basis. For unit costs or quantities of units of work which <br /> are not pre-determined, execute Work under Construction Change Directive. Changes in <br /> Contract Sum or Contract Time will be computed as specified for Time and Material <br /> Change Order. <br /> H. Construction Change Directive: Designer may issue directive, on AIA Form G713 <br /> Construction Change Directive] signed by Owner, instructing Contractor to proceed with <br /> change in the Work, for subsequent inclusion in a Change Order. Document will describe <br /> changes in the Work, and designate method of determining any change in Contract Sum <br /> or Contract Time. Promptly execute change. <br /> I. Time and Material Change Order: Submit itemized account and supporting data after <br /> completion of change, within time limits indicated in Conditions of the Contract. <br /> Designer will determine change allowable in Contract Sum and Contract Time as <br /> provided in Contract Documents. <br /> 16-171 Price and Payment Procedures <br /> 012000.3 <br />