Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> E. Differences in costs will be adjusted by Change Order. <br /> F. Allowances Schedule: <br /> 1. Section 024119—Selective Demolition <br /> a) Include the stipulated sum of$1,000 for removal and replacement of <br /> existing damaged or deteriorated gypsum deck. <br /> b) Provide unit cost for removal and replacement. <br /> 2. Section 061000—Rough Carpentryovide unit cost for removal and replacement. <br /> a) Include the stipulated sum of$500 for removal and replacement of <br /> existing damaged or deteriorated wood blocking. <br /> b) Provide unit cost for removal and replacement. <br /> G. At closeout of Contract, funds remaining in Allowance will be credited to Owner by <br /> Change Order. <br /> 1.04 Schedule of Values <br /> A. Submit printed schedule on AIA Form G703 - Continuation Sheet for G702. Contractor's <br /> standard form or electronic media printout will be considered. <br /> B. Submit Schedule of Values in duplicate within seven days after date established in Notice <br /> to Proceed. <br /> C. Format: Utilize Table of Contents of this Project Manual. Identify each line item with <br /> number and title of major specification Section. <br /> D. Include in each line item, amount of Allowances specified in this section. For unit cost <br /> Allowances,identify quantities taken from Contract Documents multiplied by unit cost to <br /> achieve total for each item. <br /> E. Include within each line item, direct proportional amount of Contractor's overhead and <br /> profit. <br /> F. Revise schedule to list approved Change Orders,with each Application For Payment. <br /> 1.05 Applications for Payment <br /> A. Submit three copies of each application on AIA Form G702 -Application and Certificate <br /> for Payment and AIA G703 - Continuation Sheet for G702. <br /> B. Content and Format: Utilize Schedule of Values for listing items in Application for <br /> Payment. <br /> C. Submit updated copy of construction progress schedule with each Application for <br /> Payment. <br /> D. Payment Period: Submit at intervals stipulated in the Agreement. <br /> 16-171 Price and Payment Procedures <br /> 012000.2 <br />