Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIRMENTS <br /> SECTION 012000 <br /> PRICE AND PAYMENT PROCEDURES <br /> PART 1 GENERAL <br /> 1.01 Related Documents: <br /> Drawings and general provisions of the contract including General, Supplemental, and Special Conditions <br /> and other Division 1-specification sections apply to work of this section <br /> 1.02 Section Includes <br /> A. Cash allowances <br /> B. Contingency allowances <br /> C. Schedule of values <br /> D. Applications for payment <br /> E. Change procedures <br /> F. Defect assessment <br /> G. Unit prices <br /> H. Alternates <br /> 1.03 Cash Allowances <br /> A. Costs Included in Cash Allowances: Cost of product to Contractor or Subcontractor, less <br /> applicable trade discounts. <br /> B. Costs Not Included in Cash Allowances But Included in Contract Sum: Product delivery <br /> to site and handling at site, including unloading, uncrating, and storage; protection of <br /> products from elements and from damage;and labor for installation and finishing. <br /> C. Designer Responsibilities: <br /> 1. Consult with Contractor for consideration and selection of products, suppliers, <br /> and installers. <br /> 2. Select products in consultation with Owner and transmit decision to Contractor. <br /> 3. Prepare Change Order. <br /> D. Contractor Responsibilities: <br /> 1. Assist Designer in selection of products,suppliers and installers. <br /> 2. Obtain proposals from suppliers and installers and offer recommendations. <br /> 3. On notification of selection by Designer execute purchase agreement with <br /> designated supplier and installer. <br /> 4. Arrange for and process shop drawings, product data, and samples. Arrange for <br /> delivery. <br /> 5. Promptly inspect products upon delivery for completeness, damage, and defects. <br /> Submit claims for transportation damage. <br /> 16-171 Price and Payment Procedures <br /> 012000.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.