Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> J. Provide and install other accessory or incidental components, or modify other roof <br /> features/items,not specifically listed or shown on drawings,but required for the complete <br /> and proper installation of the new roof system. <br /> 1.03 Contract Method: <br /> Construct the work based on the lump sums and unit prices provided. <br /> 1.04 Work Sequence: <br /> A Work shall proceed in a continuous and orderly manner. Phased construction is <br /> unacceptable. <br /> B The Contractor shall strive to minimize disruption to building operations and occupancy <br /> during remedial roofing activities. <br /> 1.05 Permits <br /> A. Apply for, secure, and pay for all permits, governmental fees and licenses necessary for the <br /> proper execution and completion of the Work which are applicable at the time that Bids are <br /> received. <br /> B. Obtain necessary permits and inspections for any mechanical, electrical, and/or plumbing <br /> work associated with raising/extending of existing ductwork, conduit,piping, and pipe vents <br /> to provide specified flashing clearances above new roof membrane. Provide evidence of <br /> acceptance of work by submitting inspection forms from appropriate agencies that indicate <br /> acceptance of the Work. <br /> 1.06 Existing Conditions <br /> A. Existing conditions are reflected to the best of the Designer's knowledge based on randomly <br /> and arbitrarily selected sample areas. It is the responsibility of the Contractor to visit the site <br /> as required to verify existing conditions, dimensions, and quantities, etc.prior to preparation <br /> and submission of bids. <br /> B. The Owner and Designer make no representation, warranty or guarantee that conditions <br /> indicated by the drawings and specifications are representative of those conditions found <br /> throughout the entire work areas, or that materials other than, or in proportions different <br /> from those indicated,may not exist. <br /> C. Building and site shall be accepted"as-is." Exercise care to protect existing conditions. <br /> D. Notify Owner and Designer should the conditions vary significantly from those described in <br /> the Contract Documents. <br /> E. Pre-Job Damage Survey of Facility and Site: A thorough survey of property, interior and <br /> exterior, and all rooftop penetrations and equipment shall be performed prior to starting the <br /> Work in order to document existing conditions. A photographic record of all conditions <br /> shall be provided to the Owner and Designer prior to beginning work. Damaged items <br /> identified on the photographic record shall not be the responsibility of Contractor unless <br /> further damaged by Contractor during execution of Project. Any equipment identified to be <br /> damaged or abandoned shall be reported to the Owner as a part of the survey for <br /> determination of item removal or repair. <br /> 16-171 Summary of Work <br /> 010100.2 <br />