Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> to record changes from the Contract Documents incorporated in the finished <br /> Work. All such changes shall be indicated in prominent contrasting color. <br /> Where necessary for clarity, supplementary drawings at a larger scale shall be <br /> made and print attached to the "Record Drawings". Care shall be exercised in <br /> handling the "Record Drawings"to insure an accurate permanent record. <br /> 3.11.1.3 The Architect will review the "Record Drawings" on a monthly basis <br /> during construction to determine whether the Contractor is in compliance with <br /> Clauses 3.11.1.1 and 3.11.1.2. <br /> G. Paragraph 3.12 "SHOP DRAWINGS,PRODUCT DATA,AND SAMPLES" <br /> 1. Delete Subparagraph 3.12.5 and insert in its stead the following new <br /> Subparagraph 3.12.5: <br /> 3.12.5 The Contractor shall review for compliance with the Contract Documents, <br /> approve in writing and submit, with reasonable promptness and in such sequence <br /> as to cause no delay in the Work or in the activities of the Owner or any separate <br /> contractor, all Shop Drawings, Product Data, Samples and similar submittals <br /> required by the Contract Documents. Submittals made by the Contractor which <br /> are not required by the Contract Documents may be returned without action. <br /> 2. Delete Subparagraph 3.12.7 and insert in instead the following new <br /> Subparagraph 3.12.7: <br /> 3.12.7 No portion of the Work requiring submission of a Shop Drawing,Product <br /> Data, Sample or similar submittals shall be commenced until the respective <br /> submittal has been reviewed and approved by the Architect as provided in <br /> Subparagraph 4.2.7. All such portions of the Work shall be in accordance with <br /> reviewed submittals. <br /> 3. Delete Subparagraph 3.12.8 and insert in its stead the following new <br /> Subparagraph 3.12.8: <br /> 3.12.8 The Work shall be in accordance with approved submittals except that the <br /> Contractor shall not be relieved of responsibility for deviations from the <br /> requirements of the Contract Documents by the Architect's review of Shop <br /> Drawings,Product Data, Samples or similar submittals under Subparagraph 4.2.7 <br /> unless the Contractor has specifically informed the Architect in writing of such <br /> deviation at the time of submittal and(1)the Architect has given written approval <br /> to the specific deviation as a minor change in the Work, or(2) a Change Order or <br /> Construction Change Directive has been issued authorizing the deviation. The <br /> Contractor shall not be relieved from responsibility for errors or omissions in the <br /> Shop Drawings, Product Data, Samples or similar submittals by the Architect's <br /> review thereof. <br /> H. Paragraph 3.15 "CLEANING UP" <br /> 1. Insert at the end of Subparagraph 3.15.1 the following: <br /> "In addition to the clean-up during construction as set out above, the Contractor <br /> shall also, after the Work has been completed,complete the following clean up: <br /> 1. Comply with all special cleaning instructions contained in the <br /> SGC - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.