Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> sales tax paid by the firm names and amounts and enter on the sales tax form. <br /> 3.6.5 Sales or use tax paid on purchase or rental of tools and equipment used by <br /> any prime contractor and/or Subcontractor shall be included in the Contract Sum <br /> and will not be reimbursable. <br /> 3.6.6 Sales or use tax on materials furnished under change orders will be <br /> reported by the same methods as outlined above for material furnished under the <br /> original contract. Therefore, sales or use tax, except of the type described in <br /> Subparagraph 3.6.5, shall not appear in the cost breakdown of change orders. <br /> E. Paragraph 3.10 "CONTRACTOR'S CONSTRUCTION SCHEDULES" <br /> 1. Add to Subparagraph 3.10.1 the following: <br /> "Within ten days after award of the Contract the Contractor shall submit to the <br /> Architect and Owner a chart showing the estimated progress for the component <br /> divisions of the Work, together with a composite curve showing the estimated <br /> progress for the entire Work under this Contract." <br /> 3.10.1.1 The chart will indicate the percent of the total construction cost for each <br /> item listed and list further breakdown of items shown specification section) to <br /> provide a separate item for each Work unit. <br /> 3.10.1.2 The Schedule of Values required by Subparagraph 9.2.1 is to be plotted <br /> against the project time of the project to show "Anticipated Monthly Values" and <br /> "Accumulated Scheduled Progress". Such consolidation shall not amend the <br /> requirements of 9.2.1. <br /> 3.10.1.3 This chart must be approved by the Architect and Owner, but only for <br /> the limited purpose of determining that the time limits per the Contract <br /> Documents have not been exceeded,that the major components of the Work have <br /> been included and that the chart complies with items 1 and 2 above. Such limited <br /> approval in no way constitutes an acceptance of any variation of the schedules <br /> required in the Contract Documents. <br /> 3.10.1.4 The chart shall be updated at least on a monthly basis to accurately <br /> assess the progress of the Work. The Contractor shall submit a narrative report <br /> to include, but not be limited to, a description of problem areas, current or <br /> anticipated delaying factors and their impact, and an explanation of corrective <br /> action taken or proposed. <br /> F. Paragraph 3.11 "DOCUMENTS AND SAMPLES AT THE SITE" <br /> Insert at the end of Subparagraph 3.11.1 the following: <br /> 3.11.1.1 As the Work proceeds, the Contractor shall keep a careful record of <br /> mechanical, electrical, underground and other concealed Work whose fmal <br /> in-place locations vary from those shown on the Contract Drawings, whether <br /> because of Change Orders or actual job conditions. <br /> 3.11.1.2 All such variations shall be shown on the Field Documents which shall <br /> be delivered to the Architect before final payment is processed. This copy shall <br /> be known as the "Record Drawings" and shall be used for no other purpose than <br /> SGC- 5 <br />