Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> "1.5.1 The Contract shall be signed by the Owner and Contractor." <br /> D. Paragraph 1.6 "OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND <br /> OTHER INSTRUMENTS OF SERVICE" <br /> 1. In Subparagraph 1.6.1 delete the third sentence and insert in its stead the <br /> following: <br /> "Neither the Contractor nor any Subcontractor, Sub-subcontractor, or material or <br /> equipment supplier shall own or claim a copyright in the drawings, Specifications <br /> and other documents prepared by the Architect or the Architect's Consultants, <br /> and unless otherwise indicated the Architect or the Architect's Consultants shall <br /> be deemed the author of them and the Architect and Owner will retain all <br /> common law, statutory, and other reserved rights, in addition to the copyright." <br /> III. MODIFICATIONS OF ARTICLE 2—OWNER <br /> A. Paragraph 2.2 "INFORMATION AND SERVICES REQUIRED OF THE OWNER." <br /> 1. In Subparagraph 2.2.1, in the first sentence, beginning on the second line, delete <br /> the following words: "and thereafter". <br /> 2. In Subparagraph 2.2.1, in the second sentence, beginning on the third line delete <br /> the following words: "or continuation". <br /> 3. In Subparagraph 2.2.1 delete the third sentence in its entirety. <br /> 4. In Subparagraph 2.2.3, insert at the beginning of the first sentence: "Upon <br /> written request of the Contractor,". <br /> 5. In Subparagraph 2.2.4 insert at the beginning of the sentence "Upon request of <br /> the Contractor,". <br /> 6. Delete Subparagraph 2.2.5 and insert in its stead the following new Subparagraph <br /> 2.2.5: <br /> 2.2.5 The Contractor will be supplied with not more than 6 complete sets of <br /> Contract Documents. Additional complete sets or portions thereof may be issued <br /> upon request and on payment of reproduction costs. <br /> B. Paragraph 2.4 "OWNER'S RIGHT TO CARRY OUT THE WORK" <br /> 1. Delete the last three sentences in Subparagraph 2.4.1 and insert in its stead the <br /> following: <br /> "In such case an appropriate Change Order shall be issued deducting from <br /> payments then or thereafter due the Contractor the cost of correcting such <br /> deficiencies, including compensation for the Architect's additional services and <br /> expenses, and other expenses incurred by Owner, including but not limited to <br /> attorney fees, made necessary by such default, neglect or failure. If payments <br /> then or thereafter due to the Contractor are not sufficient to cover such amounts, <br /> the Contractor shall pay the difference to the Owner. The Owner's rights to issue <br /> the second (3 day) notice or to take corrective actions subsequent to the second <br /> notice shall not be affected if the owner allows a greater time to pass before <br /> acting." <br /> SGC -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.