Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> [Departmental Use Only] <br /> TITLE <br /> FY <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$100,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the day of <br /> , 20 , by and between , (hereinafter called the "Contractor"), and Orange County, a body <br /> corporate and politic and a political subdivision of the State of North Carolina, (hereinafter called the"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner,for the consideration herein named, agree as follows: <br /> 1. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perfonn all of the work required by this <br /> Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner and in accordance with the following enumerated documents, which are attached hereto and made a part <br /> hereof as if fully contained herein: <br /> a. Construction Drawings prepared by (Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> c. proposal dated , 20 which fully describes the work to be performed, such work <br /> hereinafter called the"Work". <br /> d. Other documents as follows: <br /> 2. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work on the date of the executed original of this Agreement <br /> and agrees to complete fully all Work included by ,20 <br /> b. Time is of the essence with respect to all dates specified in the Contract Documents as Completion <br /> Dates. <br /> c. The Contractor shall perform the Work in the time, manner and form required by the Contract <br /> Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner. <br /> d. It is expressly understood that the Owner will employ other contractors to perform work as a part <br /> of the Project whose work will be performed simultaneously and sequentially with the performance <br /> of the Work by the Contractor. It shall be necessary for the Contractor to coordinate its activities <br /> with such other contractors, particularly with respect to access to work areas, storage of materials <br /> and other common facilities. <br /> e. Should the Owner determine that the Contractor is behind schedule, it may require the Contractor <br /> to expedite and accelerate its efforts, including providing additional resources and working <br /> overtime, as necessary, to perform the Work in accordance with the approved project schedule at <br /> no additional cost to the Owner. <br /> 3. STANDARD OF CARE <br /> Revised October 2011 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.