Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> The owner will: <br /> a. Attend the scheduled prebid conference. <br /> b. Identify or determine those work areas of a contract where MBEs may have an <br /> interest in performing contract work. <br /> c. At least ten(10) days prior to the scheduled day of bid opening,the Owner will <br /> notify certified MBEs of potential contracting opportunities listed in the proposal. <br /> The notification will include the following: <br /> 1. A description of the work for which the bid is being solicited. <br /> 2. The date,time and location where bids are to be submitted. <br /> 3. The name of the individual within the agency/institution who will be <br /> available to answer questions about the project. <br /> 4. Where bid documents may be reviewed. <br /> 5. Any special requirements that may exist, such as insurance, licenses, <br /> bonds and financial arrangements. <br /> If there are more than three (3) certified MBEs in the general locality of the project who <br /> offer similar contracting or subcontracting services in the specific trade,the Owner shall <br /> notify three (3) , but may contact more, if the Owner so desires. <br /> d. Maintain documentation of any contacts, correspondence, or conversations with <br /> MBE firms made in an attempt to meet the goals. <br /> 2. Prime Contractor <br /> Under the single prime contract system,the prime contractor will: <br /> a. Attend the scheduled prebid conference. <br /> b. Identify or determine those work areas of a contract where MBEs may have an <br /> interest in performing contract work. <br /> c. At least ten(10) days prior to the scheduled day of bid opening, notify certified <br /> MBEs of potential contracting opportunities listed in the proposal. The <br /> notification will include the following: <br /> 1. A description of the work for which the bid is being solicited. <br /> 2. The date,time and location where bids are to be submitted. <br /> 3. The name of the individual within the agency/institution who will be <br /> available to answer questions about the project. <br /> 4. Where bid documents may be reviewed. <br /> 5. Any special requirements that may exist, such as insurance, licenses, <br /> bonds and financial arrangements. <br /> If there are more than three (3) certified MBEs in the general ocality of the project who <br /> offer similar contracting or subcontracting services in the specific trade,the Contractor <br /> shall notify three (3) , but may contact more, if the Contractor so desires. <br /> d. During the bidding process, comply with the contractor(s) requirements listed in <br /> the proposal for minority participation. <br /> e. Submit with the bid a description of that portion of the work to be executed by <br /> MBEs expressed as a percentage of the total price. <br /> f. Identify the MBEs the bidder intends to use on the contract, along with the dollar <br /> amount of the work to be performed by each minority business. <br /> g. Submit an affidavit that details the good faith efforts taken to procure minority <br /> business participation. <br /> h. Upon being named the apparent low bidder,the bidder shall provide the necessary <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.