Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 2. EXAMINATION OF CONDITIONS <br /> It is understood and mutually agreed that by submitting a Bid the contractor acknowledges that it has <br /> carefully examined the Bidding Documents pertaining to the work, the location, accessibility and <br /> general character of the site of the work and all existing buildings and structures within and adjacent <br /> to the site; and has satisfied itself as to the nature of the work,the condition of existing buildings and <br /> structures, the conformation of the ground, the character, quality and quantity of the materials to be <br /> encountered; the character of the equipment, machinery, plant and any other facilities needed <br /> preliminary to and during execution of the work; the general and local conditions; the construction <br /> hazards; and all other matters, including but not limited to, the labor situation which can in any way <br /> affect the work under the Contract; and including all safety measures required by the Occupational <br /> Safety Health Act of 1970 and all rules and regulations issued pursuant thereto. It is further mutually <br /> agreed that by submitting a proposal, the Contractor understands the feasibility and meaning of the <br /> plans, drawings, specifications, and other Contract Documents for the construction of the Work and <br /> that it accepts all the terms, conditions and stipulations contained therein; and that it is prepared to <br /> work in cooperation with the other Contractors performing wgrk on the site. <br /> 3. ADDENDA <br /> Any addenda to specifications issued during the time of Bidding will be sent to each Bidder, return <br /> receipt requested and are to be considered covered in the Proposal and in closing a Contract they will <br /> become part thereof It shall be the Contractor's responsibility to ascertain prior to Bid time the <br /> issuance of any Addenda and see that its Bid includes any changes thereby required. <br /> Should the Bidder find discrepancies in, or omissions from,these drawings or documents or should it <br /> be in doubt as to their meaning,it shall at once notify the Designer, who may send written,instruction <br /> in the form of Addenda to all Bidders. Notification shall not be later than three (3) days from the <br /> date set for receipt of Bids. Neither the Owner nor the Designer shall be responsible for any oral <br /> instructions. <br /> All Addenda shall be acknowledged by the Bidders (s) on the Proposal form. Failure to do so may <br /> disqualify the Bid and may cause the Bid to be rejected. <br /> 4. BID SECURITY—NOT REQUIRED <br /> Each proposal shall be accompanied by a cash deposit, or a certified check drawn on some bank or a <br /> trust company insured by the Federal Deposit Insurance Corporation, or a Bid Bond in an amount <br /> equal to not less than five percent (5%) of the Proposal, said deposit to be retained by the Owner as <br /> liquidated damages in event of failure of the successful Bidder to execute the Contract within ten(10) <br /> days after the award or to give satisfactory Surety as required by law. <br /> 5. RECEIPT OF BIDS <br /> All copies of the Bid,the Bid security,if any, and any other documents required to be submitted with <br /> the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party <br /> receiving the Bids and should be identified with the Project name;Bid Number;time and date of Bid <br /> Opening; the Bidder's name and address; Bidder's license number and, if applicable, the designated <br /> portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope <br /> shall be enclosed in a separate mailing envelope with the notation 'SEALED BID ENCLOSED" on <br /> the face thereof <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.