Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> Addendum No. 1 -Prebid Minutes <br /> Central Recreation Center <br /> September 21,2016 <br /> Page 3 <br /> o Modification of curbs and penetrations to provide flashing height of eight inches above <br /> finished roof membrane. <br /> Existing roof system components: <br /> Conventional multiple ply built-up <br /> Gypsum deck <br /> Section 015000—Temporary Facilities and Controls <br /> The Owner will furnish electricity and water required for construction. Access to electricity and <br /> water will be as designated by the Owner. All wiring needed to facilitate construction is to be <br /> temporary in nature and furnished and installed at no cost to the Owner. Upon completion of the <br /> work wiring is to be removed and service restored to its original condition. <br /> Section 017850—Warranties <br /> 5-year contractor warranty required. <br /> 20-year manufacturer warranty required. <br /> Section 024119—Selective Demolitions <br /> Remove existing roof to deck. <br /> Section 035010—Gypsum Deck Repair <br /> Repair of damaged deck. <br /> Section 061000—Rough Carpentry <br /> New wood blocking and nailers required. <br /> Section 072120—Board Insulation <br /> Insulation system consisting of one layer (1.5") of polyisocyanurate board insulation. Tapered <br /> material to be installed over the 1.5"base layer. <br /> Section 075217—Polymer Modified Bituminous Membrane Roofing(Cold Applied) <br /> 2-ply system to be installed. Membrane to be installed in cold adhesive. <br /> Section 076200—Sheet metal flashing and Trim <br /> New sheet metal to include edging and miscellaneous trim. <br /> Section 077200—Roof Accessories <br /> New wall-mounted ladder and roof hatch to be installed with safety rail. <br /> VII. DRAWINGS <br /> No comments <br /> VIII. SITE TOUR <br /> Wall-mounted ladder to be installed from top of landing to roof. <br />
The URL can be used to link to this page
Your browser does not support the video tag.