Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> B. Thoroughly remove all materials from existing joint. Resulting joint shall be thoroughly <br /> cleaned, without residue, and properly prepared to receive new materials. Use <br /> mechanical means for cleaning if necessary being careful not to cause undue damage to <br /> surrounding surfaces. <br /> C. All surfaces in contact with sealant shall be dry, sound, and well brushed and wiped free <br /> from dust. <br /> D. Where back-up material is required, insert the approved backer-rod or bond-breaker tape in <br /> the joint cavity to the required depth. <br /> E. Prior to proceeding with the work, prepare and install one complete joint to be used as a <br /> standard for the remainder of the project. Joint shall be reviewed and accepted by the <br /> Designer prior to proceeding. <br /> 3.03 Installation of Back-Up Material <br /> A. Use only the back-up material recommended by the manufacturer of the sealant and <br /> approved by the owner for the particular installation, compressing the back-up material <br /> 25 to 50 percent to secure a positive and secure fit. When using back-up of tube or rod <br /> stock, avoid lengthwise stretching of the material. Do not twist or braid hose or rod back- <br /> up stock. <br /> B. Install backstops dry and free of tears or holes. Tightly pack the back or bottom of joint <br /> cavities with backstop material to provide a joint of the depth specified. <br /> 3.04 Primer <br /> A. Immediately prior to application of the sealant, clean out loose particles from joints. <br /> B. Where recommended by sealant manufacturer, apply primer to joints in accordance with <br /> sealant manufacturer's instructions. Do not apply primer to exposed finish surfaces. <br /> C. Apply primer in a thin,uniform film. Avoid build-up of film. <br /> D. Allow approximately 15 to 120 minutes drying time prior to applying sealant. Sealant <br /> must be applied same day as primer. <br /> E. Do not prime or puncture backer-rod. Do not apply primer to exposed finish surfaces. <br /> 3.05 Bond Breaker <br /> A. Provide bond breakers to the back or bottom of joint cavities, as recommended by the <br /> sealant manufacturer for each type of joint and sealant used, to prevent sealant from <br /> adhering to these surfaces. <br /> B. Carefully apply the bond breaker to avoid contamination of adjoining surfaces or <br /> breaking bond with surfaces other than those covered by the bond breaker. <br /> 16-171 Sealants and Caulking <br /> 079200-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.