Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 3.09 Walkway Pad <br /> A. Provide walkway pad around all roof top equipment. Walkway shall be installed with two- <br /> inch gap between sheets for drainage. <br /> B. Walkway shall be adhered to the surfacing sheet with adhesive or as recommended by the <br /> membrane manufacturer. <br /> C. Walkway pad shall be straight and true. Use straight edge or snap lines as required. <br /> END OF SECTION <br /> 16-171 Polymer Modified Bituminous Membrane Roofing <br /> 075217-9 <br />