Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 2. One part thixotropic asphalt-based adhesive. <br /> 3. One part, moisture cured asphaltic urethane with elastomeric characteristics. <br /> Adhesive may be used in conjunction with primer. <br /> 4. Single component,moisture cured polyurethane adhesive <br /> B. Tapered edge and cant strips: Tapered edge and cant strips shall be prefocrued—tapered <br /> material shall be 2 inch X 24 inch fiberboard; cant strip shall be 45 degree X 4 inch X 1.5 <br /> inch. Tapered edge and cant strips shall confoun to ASTM C208, Type II, Grade 1. <br /> Tapered edge strip of appropriate size shall be installed at saddles, crickets and other <br /> similar locations to provide a smooth transition to board insulation. <br /> 2.03 Acceptable Manufacturers <br /> Products and materials shall be as manufactured by Atlas, Carlisle, Firestone, GAF, Siplast, <br /> Soprema,or approved equal. <br /> PART 3 EXECUTION <br /> 3.01 Inspection <br /> A. Verify that surfaces and site conditions are ready to receive work. <br /> B. Verify that deck is supported, secured,and do not exhibit excessive deflection. <br /> C. Verify that deck is sound,smooth, and free of depressions and shallow areas. <br /> D. Verify that surfaces to receive insulation are clean, smooth, free of depressions and <br /> projections, and have no obstructions to retard drainage of water. <br /> E. Verify that wood blocking, curbs, and nailers are securely anchored to the roof deck at <br /> roof penetrations and terminations and match the thickness of the insulation. <br /> F. Verify that pipes, sleeves, ducts, and vents through the roof are solidly set and fastened <br /> into place. Seal around all roof penetrations and perimeters to prevent drippage of roof <br /> products into the building. <br /> G. Verify that projections will provide eight inches of finished flashing height as a minimum <br /> 12 inches where possible. Modify curbs and projections as necessary to achieve height. <br /> H. Installation of the insulation system shall result in positive drainage. Verification of <br /> positive drainage through the use of stringlines,building levels, etc.,may be necessary. <br /> I. Application of materials shall constitute acceptance of the surface by the contractor. <br /> J. Should the substrate be found unacceptable and outside the preparation requirements <br /> contracted for, the Owner's representative shall be immediately notified in writing to <br /> allow appropriate actions to be taken. <br /> 16-171 Board Insulation <br /> 072120-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.