Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 7 <br /> THERMAL AND MOISTURE PROTECTION <br /> SECTION 072120 <br /> BOARD INSULATION <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental, and Special <br /> Conditions and other Division 1 specification sections apply to work of this section. <br /> 1.02 Work Included <br /> A. Installation of polymer modified membrane base sheet over existing deck. <br /> B. Installation of new polyisocyanurate board insulation. Flat and tapered materials to be <br /> installed as depicted on drawings. <br /> 1.03 Related Work <br /> A. Section 061000-Rough Carpentry <br /> B. Section 075217-Polymer Modified Bituminous Membrane Roofing(Cold Applied) <br /> 1.04 Quality Assurance <br /> A. Standards: Comply with standards specified in this section and as listed in the general <br /> requirements. <br /> B. Qualifications of Manufacturer: Products used in the work included in this section shall <br /> be produced by manufacturers regularly engaged in the manufacturer of similar items and <br /> with a history of successful production acceptable to the Owner. <br /> C. Qualifications of Contractor: The Contractor and its personnel shall be currently <br /> approved by the manufacturer of the approved products as qualified to install the <br /> materials of this section. <br /> D. Qualifications of Installers: Use adequate numbers of skilled workmen who are <br /> thoroughly trained and experienced in the necessary crafts and who are completely <br /> familiar with the specified requirements and methods needed for proper performance of <br /> the work in this section. <br /> E. Inspections: Make all required notifications and secure all required inspections by the <br /> manufacturer of the approved materials to facilitate issuance of the specified roof <br /> warranty. <br /> 1.05 Submittals <br /> A. Provide submittals for all materials described in this Section. <br /> { <br /> B. Provide manufacturer's layout of tapered insulation system. <br /> 16-171 Board Insulation <br /> 072120-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.