Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> C. Verify that curbs are sound, firmly anchored, smooth, and clean on surfaces scheduled to <br /> receive new nailers. <br /> D. Verify that surfaces of masonry walls are sound, firmly anchored, and smooth. Provide new <br /> masonry units as required. <br /> E. Document the actual quantities of materials installed in progress reports to Designer. <br /> • <br /> 3.02 Installation—Nailers and Blocking <br /> A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, <br /> and fitted. Fit rough carpentry to other construction; scribe and cope as needed for <br /> accurate fit. Locate nailers and blocking to comply with requirements for attaching other <br /> construction. <br /> B. At edges, curbs and other locations where nailers and blocking occur, remove damaged, <br /> defoinred, or deteriorated materials and replace with new materials. Notify Owner and <br /> Designer of any nailer replacement. Nailers requiring replacement shall be verified by <br /> the Owner or Designer. Claims for additional cost shall be denied without verification. <br /> C. Provide nailers at perimeter of roof, around openings through roof, and where roofs abut <br /> walls, curbs, and other vertical surfaces. Except where indicated otherwise, nailers shall <br /> be 6 inches wide. <br /> D. Anchor nailers securely to underlying construction. Perimeter nailers shall be anchored <br /> in accordance with FM Loss Prevention Data Sheet 1-49. <br /> E. All nailers shall be of sufficient thickness so as to be flush with the roof insulation <br /> interface and securely anchored. <br /> F. Wood nailers and blocking shall be secured with a minimum of two fasteners per piece. <br /> Fasteners shall be positioned 6 inches from each end and a maximum of 2 feet o.c and <br /> staggered 1/3 of the nailer width. Two fasteners shall be installed at ends of nailer <br /> lengths. <br /> G. Anchors used to secure new wood nailers, blocking, etc. shall be countersunk to provide <br /> a flush finish. <br /> H. Nailers shall be grooved for edge venting; install at walls, curbs, and other vertical <br /> surfaces with a 1/4-inch gap between each length. <br /> I. New wood nailers, blocking, etc., shall be chamfered, beveled, shaved, planed, or <br /> shimmed as necessary to provide smooth transition to adjacent materials. <br /> J. Install new wood blocking to facilitate not less than 8 inches of vertical flashing above <br /> adjacent finished roof surface. <br /> K. Existing nailers remaining in place shall be firmly anchored in accordance with paragraph <br /> 3.02.D and shall be free of rot, excess moisture and deterioration. <br /> 16-171 Rough Carpentry <br /> 061000-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.