Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> B. Remove top surface of gypsum to expose wire mesh. If any of the wires are rusted <br /> through, then entire are of gypsum including the mesh and full thickness of gypsum and <br /> form board must be replaced. Continue remove top surface of gypsum in all directions <br /> down to wire mesh until uncorroded wire mesh is found. <br /> C. Remove gypsum fill from inside of once complete formboarde panel. Cut wire mesh and <br /> remove both the wire mesh and formboard. Leave a minimum 3-inch length of wire <br /> mesh next to bulb tees to allow tie-in to new mesh after installation of new foinn board.. <br /> 3.03 Installation <br /> A. Replace existing formboard with new gypsum board sprayed both sides with a 50/50 <br /> bleach and water solution. Install galvanixed cross tees at ends of boards that do not fall <br /> on joists for support. <br /> B. Tie new reinforcing mesh into existing wire mesh at each bulb tee. Place reinforcing <br /> mesh with 16 gauge wird at right angles to sub-purlins. Lap mesh ends a minimum of 6 <br /> inches; do not lap sides of mesh. <br /> C. Mix gypsum or concrete patch material in accordance with manufacture <br /> recommendations. Use heated wter when temperatire is below 40 degrees. Install slurry <br /> on flashes of bulb tees and cross tees. Keep equipment clean and avoid flash set of <br /> gypsum or concrete patch. <br /> D. Add a 2-inch wide line of slurry across diagonals of each formboard. After slurry and <br /> diagonal pattern has set, mix additional gypsum or concrete patch material. Slowly pour <br /> wet mix onto new fortnboard and screed to desired thickness. Maintain minimum pour of <br /> 2 inches above the formboard. <br /> END OF SECTION <br /> 16-171 Gypsum Deck Repair <br /> 035010-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.