Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 3 <br /> CONCRETE <br /> SECTION 035010 <br /> GYPSUM ROOF DECK REPAIR <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental and Special <br /> Conditions and other Division 1 Specification sections apply to work of this section. <br /> 1.02 Work Included <br /> Repair of damaged or deteriorated gypsum roof deck to include formboard, reinforcing mesh, <br /> poured gypsum concrete and all related items. <br /> 1.03 Related Work Specified Elsewhere <br /> Section 024119—Selective Demolition <br /> 1.04 Protection <br /> A. Limit size of work sections to safeguard adjacent materials, structures, etc. and to <br /> minimize dust,noise, and water damage. <br /> B. Protect existing site and facilities from damage during work. Do not overload new or <br /> existing construction with demolition debris, equipment,etc. <br /> C. Damage shall be repaired at Contractor's expense. <br /> D. Demolition adjacent to areas designated to remain shall be performed in a neat manner <br /> with straight lines to facilitate tie-ins of replacement materials. <br /> E. Demolition shall be performed by personnel familiar with the replacement of materials <br /> being removed. <br /> F. Excessive demolition, as determined by the Owner's representative, shall be replaced <br /> with similar and equal materials at the Contractor's expense in accordance with General <br /> Conditions of the Contract. <br /> G. Furnish necessary temporary protection from weather at all areas of demolition to protect <br /> interior of building from elements of weather at all times. Install specified roof system(s) <br /> and tie in to existing roof system as needed to make roof watertight daily. <br /> H. Maintain safety precautions during performance of the work. <br /> I. It is recommended that demolition not be performed if the chance of precipitation is 40 <br /> percent or more as reported by nearest office of the National Weather Service: daily <br /> weather log to be kept by Contractor. Contractor may, at its discretion, and in <br /> consultation with the Owner or its authorized representative, perform demolition when <br /> the chance of precipitation exceeds the noted percentage. The decision to perform <br /> demolition in no way relieves the Contractor from repair of materials, finishes, <br /> 16-171 Gypsum Deck Repair <br /> 035010-1 <br />