Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> G. Remove and dispose of all existing damaged or deteriorated wood blocking,trim, nailers, <br /> etc. <br /> H. Relocate and protect satellites, antennas, and security cameras to be reused. Temporarily <br /> relocated items must remain operational unless otherwise coordinated with the Owner's <br /> representative. Coordinate all movement with the Owner or Owner's Representative. <br /> 3.02 Decks <br /> A. Deck: Inspect decks for damage or deterioration. Repair as needed in accordance with <br /> Section 035010, Gypsum Roof Deck Repair prior to installation of new roof system. <br /> Verify areas deemed in need of repair with Designer prior to proceeding with work. <br /> B. Wood: Inspect decks for deterioration or damage. Damaged areas shall be reported to the <br /> Designer for disposition. <br /> C. Remove and dispose of damaged or deteriorated deck. Exercise caution so as not to damage <br /> supporting structural units. <br /> D. Should structural units be damaged, notify Owner and Designer for resolution prior to <br /> installing new deck. <br /> E. All repaired or replaced deck shall be verified by the Owner's Representative. <br /> END OF SECTION <br /> 16-171 Selective Demolition <br /> 024119-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.