Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> H. Maintain safety precautions during performance of the work. <br /> I. It is recommended that demolition not be performed if the chance of precipitation is 40 <br /> percent or more as reported by nearest office of the National Weather Service: daily <br /> weather log to be kept by Contractor. Contractor may, at its discretion, and in <br /> consultation with the Owner or its authorized representative, perform demolition when <br /> the chance of precipitation exceeds the noted percentage. The decision to perform <br /> demolition in no way relieves the Contractor from repair of materials, finishes, <br /> furnishings, surfaces, etc. which may become damaged resultant from precipitation. A <br /> severe weather plan must be provided to the Designer and Owner indicating procedures <br /> to be utilized in the event of severe or hazardous weather conditions. <br /> PART 2 • PRODUCTS <br /> 2.01 Materials <br /> A. Except where noted otherwise, materials being demolished become the property of the <br /> Contractor. <br /> B. Remove debris in such a manner as to prevent accumulation on the roof. Demolition debris <br /> shall be legally weighed and disposed or recycled by Contractor. Debris shall be removed <br /> from the roof daily. Debris shall be covered when Contractor is not on site. <br /> PART 3 EXECUTION <br /> 3.01 Demolition—Roof Systems <br /> A. Document actual quantities removed for any materials bid on a unit price basis and report <br /> to Designer. <br /> B. Remove and dispose of existing roof systems to include insulation and associated <br /> flashing down to the existing deck. <br /> C. Exercise caution to minimize potential damage to the existing decks or substrates. <br /> D. Should the deck or substrate become damaged, repair shall be made prior to installing <br /> new roof system. Notify the Owner or Designer of any deck repair or replacement. No <br /> reimbursement shall be made for any deck repair or replacement not confirmed by the <br /> Owner or Designer. Exercise caution to minimize potential damage to the existing deck <br /> or substrate or ceiling. <br /> E. Remove and dispose of all existing baseflashing including but not necessarily limited to <br /> perimeters, curbs and projections. <br /> F. Remove and dispose of all existing sheet metal edgings, gutter, downspout, pitch pans, <br /> flashing, and lead flashing, etc. <br /> 16-171 Selective Demolition <br /> 024119-2 <br />