Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 2 <br /> EXISTING CONDITIONS <br /> SECTION 024119 <br /> SELECTIVE DEMOLITION <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental and Special <br /> Conditions and other Division 1 Specification sections apply to work of this section. <br /> 1.02 Work Included <br /> A. Removal and disposal of existing multiple ply built-up roof system including all related <br /> flashings and accessories. <br /> B. Removal and disposal of sheet metal flashings,etc. <br /> C. Removal of damaged or deteriorated wood blocking,nailers,trim,etc. <br /> 1.03 Related Work Specified Elsewhere <br /> A. Section 035010—Gypsum Roof Deck Repair <br /> B. Section 061000—Rough Carpentry <br /> C. Section 072120—Board Insulation <br /> D. Section 075217—Polymer Modified Bituminous Membrane Roofing(Cold Applied) <br /> E. Section 076200—Sheet Metal Flashing and Trim <br /> 1.04 Protection <br /> A. Limit size of work sections to safeguard adjacent materials, structures, etc. and to <br /> minimize dust,noise,and water damage. <br /> B. Protect existing site and facilities from damage during work. Do not overload existing <br /> paving, curbs, sidewalks, etc. with vehicle traffic. Do not overload new or existing <br /> construction with demolition debris, equipment, etc. <br /> C. Damage shall be repaired at Contractor's expense. <br /> D. Demolition adjacent to areas designated to remain shall be performed in a neat manner <br /> with straight lines to facilitate tie-ins of replacement materials. <br /> E. Demolition shall be performed by personnel familiar with the replacement of materials <br /> being removed. <br /> F. Excessive demolition, as deteinrined by the Owner's representative, shall be replaced <br /> with similar and equal materials at the Contractor's expense in accordance with General <br /> Conditions of the Contract. <br /> G. Furnish necessary temporary protection from weather at all areas of demolition to protect <br /> interior of building from elements of weather at all times. Install specified roof system(s) <br /> and tie in to existing roof system as needed to make roof watertight daily. <br /> 16-171 Selective Demolition <br /> 024119-1 <br />