Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5th Wall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 017710 <br /> CLEANING <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental, and Special <br /> Conditions and other Division 1 specification sections apply to work of this section. <br /> 1.02 Description <br /> Cleaning shall be performed to maintain the building and site in a clean condition through out the <br /> duration of the project. The Contractor shall comply with all requirements for cleanliness described <br /> in other sections of these specifications. <br /> 1.03 The Contractor shall conduct daily inspections to ensure that the requirements for cleanliness are <br /> being met. <br /> PART 2 PRODUCTS <br /> 2.01 Provide all required manpower, material and equipment to maintain the standard of cleanliness as <br /> defined by the Owner. <br /> 2.02 Use only those materials and equipment which are compatible with the surface being cleaned as <br /> recommended by the manufacturer or approved by the Designer. <br /> PART 3 EXECUTION <br /> 3.01 Progress Cleaning <br /> A. Stored items shall be kept in an orderly arrangement allowing maximum access and shall not <br /> impede drainage or traffic. <br /> B. Scrap,debris,waste material and other items shall not be allowed to accumulate on the roof. <br /> C. Provide storage containers for all items awaiting removal from the site. Storage containers. <br /> shall be approved by the Owner. Beat-up, unkempt Containers will not be allowed. <br /> Containers must be covered while not in use. <br /> 3.02 Inspect all arrangements of materials stored on the project site on a weekly minimum basis and shall <br /> service all arrangements in accordance with the requirements of Paragraph 3.01.A of this section. <br /> 3.03 Final Cleaning <br /> A. Except as specifically provided otherwise, "clean" shall be interpreted to mean the level of <br /> cleanliness generally attainable by skilled cleaners using commercially available building <br /> maintenance equipment and materials. <br /> 16-171 Cleaning <br /> 017710.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.