Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> D. Contractors affidavit of payment of debts and claims: Submit on AIA G706. <br /> E. Contractor shall submit Consent of Surety to final payment. <br /> F. Certification letter that no asbestos-containing materials were used. <br /> G. Three complete sets of as-built drawings — including a copy of both design and shop <br /> drawings with changes clearly marked. <br /> H. Contractor shall be responsible for proper execution of all submittals required by this section <br /> prior to delivery to the Owner through the Designer. <br /> I. Contractor shall submit a final statement of accounting to the Owner. The statement shall <br /> reflect all adjustments including but not limited to: <br /> 1. Original contract sum. <br /> 2. Change orders noting such items as: <br /> a. Unit prices <br /> b. Cash allowances <br /> c. Deductions for uncorrected work <br /> d. Deductions for reinspection payments <br /> e. Other adjustments <br /> 3. Total adjusted contract sum. <br /> 4. Previous payments. <br /> 5. Remaining sum due. <br /> J. The Designer shall prepare a fmal change order reflecting approved adjustments not <br /> previously noted by change orders. <br /> 3.05 Final Application for Payment <br /> A. Contractor shall submit fmal application for payment in accordance with the specifications. <br /> B. Designer shall issue a fmal certificate in accordance with the specifications. <br /> END OF SECTION <br /> 16-171 Project Closeout Procedures <br /> 017700.3 <br />