2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 3. The time to be allowed for Contractor to complete or correct listed items. <br /> 4. Time and date Owner will assume possession of the work or designated portion <br /> thereof. <br /> 5. Signature of Designer and Contractor. <br /> E. Contractor shall then complete or correct those items so listed within the designated time and <br /> inform the Owner and Designer upon completion. <br /> F. Should the Owner and Designer determine that the work is not substantially complete the <br /> Designer shall immediately notify the Contractor in writing stating the reasons. Contractor <br /> shall then complete the work and send a second written notice to the Designer certifying that <br /> the project or designated portion thereof, is substantially complete. The Designer shall re- <br /> inspect the work within seven days after receipt of certification. <br /> 3.02 Final Inspection <br /> A. Contractor shall: Submit written certification to the Designer that: <br /> 1. The contract documents have been reviewed. <br /> 2. Work has been completed in accordance with the contract documents. <br /> 3. The project has been inspected for compliance with the contract documents. <br /> 4. The project is ready for fmal inspection. <br /> B. Provide safe access to all areas of the facility to accommodate personnel for the final <br /> inspection. <br /> C. The Designer shall make a final inspection within ten days after receipt of certification. <br /> D. Should the Designer determine that the work is finally complete in accordance with the <br /> requirements of the contract documents, the Designer shall request that the Contractor <br /> submit the appropriate project close-out documentation. <br /> E. Should the Designer determine that the work is not finally complete, the Designer shall <br /> immediately notify the Contractor in writing stating reasons. The Contractor shall then take <br /> immediate measures to remedy the stated deficiencies and send an additional written notice <br /> to the Designer certifying that the work is complete. The Designer shall re-inspect the work <br /> within ten days after receipt of certification. <br /> 3.03 Reinspection Costs <br /> Should the Designer incur additional charges as a result of additional inspections for non- <br /> compliance,the Contractor shall compensate the Owner for such additional charges. Such costs shall <br /> be deducted from fmal payment to the Contractor. <br /> 3.04 Close-out Submittals <br /> A. Project record documents:As required by Section 017839. <br /> B. Warranties:As required by Section 017850. <br /> C. Evidence of payment and release of liens. <br /> 16-171 Project Closeout Procedures <br /> 017700.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.