Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 3. The time to be allowed for Contractor to complete or correct listed items. <br /> 4. Time and date Owner will assume possession of the work or designated portion <br /> thereof. <br /> 5. Signature of Designer and Contractor. <br /> E. Contractor shall then complete or correct those items so listed within the designated time and <br /> inform the Owner and Designer upon completion. <br /> F. Should the Owner and Designer determine that the work is not substantially complete the <br /> Designer shall immediately notify the Contractor in writing stating the reasons. Contractor <br /> shall then complete the work and send a second written notice to the Designer certifying that <br /> the project or designated portion thereof, is substantially complete. The Designer shall re- <br /> inspect the work within seven days after receipt of certification. <br /> 3.02 Final Inspection <br /> A. Contractor shall: Submit written certification to the Designer that: <br /> 1. The contract documents have been reviewed. <br /> 2. Work has been completed in accordance with the contract documents. <br /> 3. The project has been inspected for compliance with the contract documents. <br /> 4. The project is ready for fmal inspection. <br /> B. Provide safe access to all areas of the facility to accommodate personnel for the final <br /> inspection. <br /> C. The Designer shall make a final inspection within ten days after receipt of certification. <br /> D. Should the Designer determine that the work is finally complete in accordance with the <br /> requirements of the contract documents, the Designer shall request that the Contractor <br /> submit the appropriate project close-out documentation. <br /> E. Should the Designer determine that the work is not finally complete, the Designer shall <br /> immediately notify the Contractor in writing stating reasons. The Contractor shall then take <br /> immediate measures to remedy the stated deficiencies and send an additional written notice <br /> to the Designer certifying that the work is complete. The Designer shall re-inspect the work <br /> within ten days after receipt of certification. <br /> 3.03 Reinspection Costs <br /> Should the Designer incur additional charges as a result of additional inspections for non- <br /> compliance,the Contractor shall compensate the Owner for such additional charges. Such costs shall <br /> be deducted from fmal payment to the Contractor. <br /> 3.04 Close-out Submittals <br /> A. Project record documents:As required by Section 017839. <br /> B. Warranties:As required by Section 017850. <br /> C. Evidence of payment and release of liens. <br /> 16-171 Project Closeout Procedures <br /> 017700.2 <br />