Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 017700 <br /> PROJECT CLOSEOUT PROCEDURES <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General and Supplementary Conditions <br /> and other Division 1 specification sections apply to work of this section. <br /> 1.02 Description <br /> To provide a specific format for substantial completion and final inspection. <br /> 1.03 Related requirements specified elsewhere. <br /> A. Cleaning: Section 017710 <br /> B. Project Record Documents: Section 017839 <br /> C. Warranties: Section 017850 <br /> D. Close-out submittals required for trades: Respective section of specification <br /> 1.04 Quality Assurance <br /> A. All documents submitted to the Designer shall be signed by a person authorized to endorse <br /> contracts on behalf of the Contractor. <br /> B. All formats for documents shall be approved by the Designer. <br /> PART 2 PRODUCTS <br /> Not Used <br /> PART 3 EXECUTION <br /> 3.01 Substantial Completion <br /> A. Substantial completion—The Work has progressed to the point where, in the opinion of the <br /> Designer,it is sufficiently complete, in accordance with the Contract Documents, so that the <br /> Work can be utilized for the purposes for which it is intended. <br /> B. Submit written certification to the Designer when the project or designated portion of the <br /> project is substantially complete. A list of major items to be completed or corrected shall be <br /> stated. <br /> C. Owner and Designer shall make an inspection within ten days after receipt of certification. <br /> D. Should the Owner and Designer determine that the work is substantially complete, the <br /> Designer shall prepare and issue a certificate of substantial completion containing: <br /> 1. Date of Substantial Completion <br /> 2. Listing of items to be completed or corrected and any amendments by Owner. <br /> 16-171 Project Closeout Procedures <br /> 017700.1 <br />