Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 3. Products and materials of other manufacturers: Submit a written request for <br /> substitution stating manufacturer, product or material trade name, and product's or <br /> material's ability to meet or exceed the specifications. <br /> 1.06 Substitutions <br /> A. Should the Contractor desire to use products of other manufacturers than those specified, a <br /> written request shall be made to the Designer a minimum of three days prior to the date for <br /> receiving bids. <br /> B. Substitutions of other, non-specified, products or materials shall be considered only when <br /> specified products or material become unavailable due to no fault of contractor and if the <br /> non-specified products or materials meet or exceed all criteria of the specified products. <br /> C. Contractor shall document each request with complete data substantiating compliance of <br /> proposed substitution with contract documents. <br /> D. Request for substitution constitutes a representation that Contractor: <br /> 1. Has investigated proposed product or material and determined that it meets or <br /> exceeds,in all respects,specified product(s). <br /> 2. Shall provide the same warranty for the substitution as for specified product(s) <br /> and/or materials. <br /> 3. Shall coordinate installation and make other changes which may be required for <br /> work to be complete in all respects. <br /> 4. Waives claims for additional costs which may subsequently become apparent. <br /> E. Substitutions shall not be considered when they are indicated or implied on Shop Drawings <br /> or Product or Material Data submittals without separate written request, or when acceptance <br /> will require substantial revision of Contract Documents. <br /> F. Designer shall determine acceptability of proposed substitution and will notify Contractor of <br /> acceptance or rejection in writing within a reasonable time. <br /> G. Designer shall evaluate each substitution submittal for possible credit to the Owner. <br /> 1.07 Workmanship <br /> Work shall be performed by persons qualified and trained to install the specified products which will <br /> result in the workmanship and quality specified and to afford the manufacturer's guaranty. <br /> 1.08 Manufacturer's Instructions <br /> A. Work shall be performed in accordance with materials manufacturer's specifications and <br /> associated details submitted in accordance with Section 013300,Submittals unless otherwise <br /> noted. <br /> 16-171 Product Requirements <br /> 16000.3 <br />