Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 016000 <br /> PRODUCT REQUIREMENTS <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General and Supplementary General <br /> Conditions and other Division 1 specification sections apply to work of this section. <br /> 1.02 Products <br /> A. Products include materials, equipment and systems. <br /> B. Furnish products of qualified manufacturers suitable for intended use. Furnish products <br /> of each type by single manufacturer unless specified otherwise. <br /> C. All materials shall comply with specifications and referenced standards as minimum <br /> requirements. The latest edition of referenced standards apply unless specifically stated <br /> otherwise. <br /> D. Do not use materials and equipment removed from the existing structure, except as <br /> specifically required or allowed by contract documents. <br /> E. All materials and construction procedures used in the roofing work for this project shall <br /> comply with Factory Mutual Class I construction, Underwriters Laboratory Class A, and <br /> State and Local standards and codes. Evidence of compliance with these provisions shall <br /> be provided in accordance with Section 013300, Submittals. <br /> 1.03 Product Delivery <br /> A. All aspects of material and equipment transportation, delivery,unloading,handling, storage, <br /> etc. necessary to get materials and equipment to the roof shall be the responsibility of the <br /> Contractor. <br /> B. Products shall be transported by methods to avoid product damage;deliver all materials with <br /> manufacturer's labels intact and legible. <br /> C. Promptly inspect shipments to ensure products comply with requirements, quantities are <br /> correct, and products are undamaged. <br /> D. Provide equipment and personnel to handle products by methods to prevent damage,soiling, <br /> or disfigurement. Damaged material shall be subject to rejection by the Owner or Designer. <br /> E. Arrange deliveries of materials in accordance with construction schedules and in ample time <br /> to facilitate inspection prior to installation. <br /> 16-171 Product Requirements <br /> 16000.1 <br />