Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 015639 <br /> TEMPORARY TREE AND PLANT PROTECTION <br /> PART 1 GENERAL <br /> 1.01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental, and Special <br /> Conditions and other Division 1 specification sections apply to work of this section. <br /> 1.02 Description <br /> A. Barriers shall be woven wire fence with metal posts. <br /> B. Removal, replanting, and repairing of damaged plants shall be completed by a nurseryman <br /> or tree surgeon in a manner acceptable to the Owner. Plants designated to be removed and <br /> kept alive shall be removed,cared for and replanted by a qualified specialist of the plant type <br /> involved. <br /> C. Regrading and seeding of disturbed areas. Disturbed areas shall be regraded and reseeded to <br /> match the original conditions,as a minimum. <br /> PART 2 PRODUCTS <br /> 2.01 Materials <br /> A. Topsoil: Shall be natural or cultivated surface-soil layer containing organic matter(min 4%, <br /> max.25%)and sand, silt,and clay particles. Topsoil shall have an acidity range of 5.5 to 7.5 <br /> and shall be friable, pervious, and black or a darker shade of brown, gray, or red than <br /> underlying subsoil. Topsoil shall be reasonably free of subsoil, clay lumps,gravel,and other <br /> objects more than 2 inches in diameter, and free of weeds, roots, and other deleterious <br /> materials. It shall not be excessively acidic or alkaline nor contain toxic substances harmful <br /> to plant growth <br /> B. Peat: shall be low in mineral and wood content and consist of partially decomposed <br /> vegetable matter,mildly acidic. <br /> C. Pine Bark: for soil mixing shall be aged 3/8" or finer,others shall be nuggets. <br /> D. Soil Mixture: shall be approximately 50%topsoil, and 25% each of soil mixing pine bark <br /> and peat. <br /> E. Seed: shall be per Owner's standards. <br /> F. Fence Materials: shall be per Owner's standards. <br /> 16-171 Temporary Tree And Plant Protection <br /> 015639.1 <br />