Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> B. All storage and staging areas are subject to approval by the Owner or its authorized <br /> representative. <br /> C. All materials shall be on pallets and covered with non-condensing tarps. Any damaged <br /> material shall be replaced at no cost to the Owner. <br /> D. All flammable materials must be stored in an approved container or storage facility and must <br /> have lids in place while not in use. Flammable materials must be stored in accordance with <br /> the Owner's requirements. All open containers shall be removed from the roof daily. <br /> 2.08 Vehicular Access <br /> A. Location of vehicle access shall be as designated by Owner. If necessary, extend and <br /> relocate vehicle access as Work progress requires; provide detours as necessary for <br /> unimpeded traffic flow. <br /> B. Construct temporary bridges and culverts to span low areas and allow unimpeded <br /> drainage. <br /> C. Provide unimpeded access for emergency vehicles. Maintain 20 feet wide driveways <br /> with turning space between and around combustible materials. <br /> D. Provide and maintain access to fire hydrants and control valves free of obstructions. <br /> 2.09 Parking <br /> A. Construction vehicles shall enter the project site and park in areas as directed by the Owner. <br /> The Contractor shall be responsible for coordination of traffic by its subcontractors, <br /> suppliers, etc., so as not to disrupt ongoing operations of the Owner. If on site parking is <br /> not sufficient,the Contractor shall make arrangements for off site parking. <br /> B. Maintain traffic and parking areas in sound condition free of construction equipment, <br /> products, mud, snow, and ice. Maintain existing paved areas used for construction; <br /> promptly repair breaks, potholes, low areas, standing water, and other deficiencies, to <br /> maintain paving and drainage in original, or specified, condition. <br /> C. Remove temporary materials and construction at Substantial Completion. Repair existing <br /> facilities damaged by use,to original condition. <br /> D. Provide means of removing mud from vehicle wheels before entering street <br /> 2.10 Field Office <br /> The Contractor may provide a Field Office. The location shall be subject to the approval of the <br /> Owner. <br /> 2.11 Plans,Specifications and Submittals <br /> Two copies of plans and specifications will be made available to the Contractor in digital format. <br /> Additional copies may be acquired upon request. Should hard copies be desired, two copies will be <br /> made available. Cost of reproduction and handling shall be borne by the Contractor. The Contractor <br /> shall be responsible for maintaining at least one current set of plans, specifications, reviewed <br /> submittals,and record drawings at the project site for the duration of construction. <br /> 16-171 Temporary Facilities and Controls <br /> 015000.4 <br />