Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> C. Provide for debris removal services and containers. Placement and servicing of containers <br /> shall be coordinated with the Owner. <br /> D. Residue and debris from all operations shall not be allowed to accumulate on the project site. <br /> Debris shall be removed and properly disposed of daily in accordance with all Owner <br /> Federal,State and Local regulations. The weights of all disposed materials shall be collected <br /> and provided to the owner. Any container left unattended shall be marked and covered. <br /> E. Fumes, dust, dirt and debris created by project construction shall be properly contained or <br /> controlled by the Contractor. Method(s)of control shall be approved by the Designer and/or <br /> Owner's Representative. <br /> 2.06 Safety and Protection of Facilities <br /> A. Comply with the general conditions of this specification concerning safety and protection. <br /> B. Contractor shall take all necessary precautions and shall be totally responsible for guarding <br /> against unintentional fires and shall provide suitable and adequate fire extinguishers <br /> conveniently located on the roof at staging areas, storage areas, and at areas on around <br /> equipment where an open flame is being used. Competent operators shall be in attendance <br /> at all times and shall be properly trained or instructed in fire prevention. <br /> C. Walls,windows,roof edges, etc., adjacent to equipment lines,hoists, and staging areas shall <br /> be protected using canvas tarpaulins. Plastic or felt will not be acceptable. <br /> D. Plywood,minimum of 5/8 inch thick, or other suitable materials shall be used to protect roof <br /> areas from damage that may be caused by concentrated equipment loads and foot traffic. <br /> E. Roof traffic shall be confined to work areas. Contractor shall be,responsible for leaks and <br /> repairs that develop in traffic areas during and after project completion. <br /> F. -Keep roof hatches closed at all times. Cover or barricade all roof openings to prevent falls. <br /> G. Work shall be coordinated so as to prevent working,foot traffic, and storage of materials and <br /> equipment on newly completed roof areas. <br /> H. Provide the Owner with off-hours telephone numbers of its project supervisor,foreman, etc., <br /> to allow contact by the Owner if an emergency arises. <br /> I. All Contractor personnel shall have appropriate identification on their person at all times <br /> while on site. Identification may consist of photo I.D., uniforms with individual name and <br /> Contractor name,etc. <br /> J. No Contractor personnel will be allowed inside the facility other than the Foreman or <br /> Superintendent. <br /> K. Inspect the work area and access pathway each day for any openings that may allow <br /> water to enter the building. Any openings shall be temporarily patched. <br /> 2.07 Storage <br /> A. Contractor shall be responsible for proper storage of equipment, materials, and devices <br /> furnished by itself and/or its subcontractors and suppliers. <br /> 16-171 Temporary Facilities and Controls <br /> 015000.3 <br />