Orange County NC Website
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> 1.04 Quality Control-Manufacturer <br /> A. The membrane manufacturer shall provide qualified technical (no sales) personnel to <br /> observe field conditions, and material installation at start of field work and at intervals as <br /> noted in Section 075217, Polymer Modified Bituminous Membrane Roofing (Cold <br /> Applied). The Manufacturer's representative shall submit a written report(s) to the <br /> Designer and Owner listing observations and recommendations. The Roofing contractor <br /> shall be responsible for ensuring site visits by the membrane manufacturer's <br /> representative(s) and shall notify the Owner, Owner's Representative, and Designer of any <br /> scheduled visits 48 hours in advance of visit. <br /> B. The Manufacturer's representative(s) shall certify that it has thoroughly reviewed the <br /> project with Contractor's field personnel. <br /> PART 2 PRODUCTS <br /> Not Used <br /> PART 3 EXECUTION <br /> Not Used <br /> END OF SECTION <br /> 16-171 Quality Control <br /> 014000.2 <br />