Browse
Search
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 8:17:06 AM
Creation date
11/17/2016 8:24:24 AM
Metadata
Fields
Template:
Contract
Date
11/7/2016
Contract Starting Date
11/7/2016
Contract Ending Date
1/15/2017
Contract Document Type
Agreement - Construction
Amount
$170,320.00
Document Relationships
2017-318-E AMS - Baker Roofing - Amendment to 2016-659-E roofing contract to increase original price
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-327-E Health - Piedmont Health Services, Inc. - Amendment to Komen Grant Support Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-659-E AMS - Baker Roofing to replace Central Recreation Building roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A9CF8A9E-4CDB-4BB9-A678-D4AD80CD1393 <br /> 5thWall Building Diagnostics Consultants Roof Replacement <br /> Central Recreation Center <br /> Hillsborough,NC <br /> August 2016 <br /> PART 2 PRODUCTS <br /> Not Used <br /> PART 3 EXECUTION <br /> 101 Timing <br /> A. Make all submittals in accordance with schedules specified herein unless otherwise required. <br /> B. A minimum of ten working days shall be allowed for review by the Designer following its <br /> receipt of the submittal. <br /> C. Delays caused by tardiness in receipt of submittals shall not be an acceptable basis for <br /> extension of the contract completion date. <br /> 3.02 Review <br /> A. Review by the Designer shall be directed to the general method of construction only and <br /> shall not be construed as a complete check,nor shall this review relieve the Contractor from <br /> responsibility for errors and/or omissions which may exist. <br /> B. The notations"Reviewed" or"Reviewed as noted" signed off by the Designer shall authorize <br /> the Contractor to proceed with fabrication, purchase, or both subject to the revisions, if any <br /> required by the Owner's review comments. The notations "Revise and Resubmit" or <br /> "Disapproved and Resubmit" shall require appropriate action and shall not authorize the <br /> Contractor to proceed until the item(s)in question have/has been corrected. <br /> C. The Contractor shall make all revisions as required. If the Contractor considers any required <br /> revisions to constitute a change notification shall be given to the Designer under the <br /> provisions as specified in the general conditions. Only those revisions directed or approved <br /> by the Designer shall be shown on the resubmittal. <br /> D. After a submittal has been approved by the Designer, substitution of materials or equipment <br /> shall not be considered unless approved by the Designer and accompanied by an acceptable <br /> explanation as to the necessity of the substitution. <br /> 3.03 Claims for Extra Cost <br /> No claim for extra cost shall be based on Work shown on shop drawings unless such claim is made <br /> on the Contractor's letter of transmittal accompanying the shop drawings and is approved by the <br /> Owner in writing. <br /> 3.04 Payment for Review <br /> A. Initial Services: The Designer shall provide an initial review and one subsequent review of <br /> submittals as required. <br /> B. Subsequent Reviews: The Designer's costs associated with additional reviews required <br /> beyond the initial review and one subsequent review shall be paid directly by Contractor. <br /> END OF SECTION <br /> 16-171 Submittals <br /> 013300.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.