Orange County NC Website
Appendix 6. School Construction Project Components <br />• <br />Purchase and contracted pricing of property <br />• <br />Survey <br />Site Acquisition — Tasks and <br />. <br />Deed recording <br />costs associated with acquiring <br />Appraisals <br />a site <br />• <br />Soils, environmental, suitability testing <br />• <br />Legal fees associated with purchase and recording <br />• <br />Pre - grading <br />• <br />Grading to include playing fields and playgrounds <br />• <br />Installation of storm water run -off drainage <br />Hard Construction —Site & <br />• <br />Soil suitability testing (rock) <br />Vertical Tasks and costs of <br />"horizontal" "vertical' <br />• <br />Utility extension /installation <br />and <br />• <br />Sidewalks <br />construction: all construction <br />• <br />Turn lanes <br />activities for the actual site <br />and building <br />• <br />Building Structure and Systems (includes General <br />Contractor and all Sub - Contractors <br />• <br />Municipal Requirements <br />• <br />Landscaping <br />Hard Construction — Off - <br />Site <br />• <br />Off -site Traffic Improvements <br />Tasks and costs of <br />. <br />Water and Sewer Service to the Site <br />"horizontal" construction: all <br />. <br />Off -Site Environmental Mitigation <br />construction activities for the <br />. <br />Trails and Greenway System <br />surrounding area, not <br />. <br />Related Design <br />including the building and <br />direct site <br />• <br />Prime Construction Contracts (includes general <br />Construction Costs — <br />contractor, electrical contractor, HVAC contractor, <br />Costs of constructing a new <br />plumbing contractor) <br />facility or renovating an <br />• <br />Other construction related work <br />existing one <br />• <br />Sprinkler <br />• <br />Expanded Water Flows <br />