Orange County NC Website
i) Types of landscaping and buffers at all school sites <br />ii) Installing synthetic playing fields or equipping athletic fields with irrigation <br />systems <br />iii) Installing covered walkways at student drop -off areas, main entrances and <br />bus loading areas <br />iv) Reducing student drop -off lanes <br />It is also important to note that the cost of the regulatory process has <br />historically been high and require from 12 to 24 months before the <br />construction project can begin. <br />11:3 <br />