Browse
Search
Agenda - 04-30-2007-a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 04-30-2007
>
Agenda - 04-30-2007-a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:29:28 AM
Creation date
8/28/2008 11:41:38 AM
Metadata
Fields
Template:
BOCC
Date
4/30/2007
Document Type
Agenda
Agenda Item
a
Document Relationships
Minutes - 20070430
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
School/Gounty Collaboration Work Group Proposal <br />Traditional and Non-Traditional Models <br />The Collaboration Work Group recommends that the Standards make a distinction at all <br />levels -elementary, middle and high - between "traditional" school models and "non- <br />traditional" ones. <br />Traditional IlAodel -The planning model for a traditional school is set out <br />in these standards. Capacity of a traditional school would be 585 for <br />elementary schools, 700 for middle schools and would range from 1,000 <br />to 1,500 for high schools. For the most part, a traditional model would <br />consist of a site that would have sufficient acreage to allow for future <br />building expansion, outdoor play areas, full complement of athletic <br />facilities and on-site parking for faculty, students and buses. <br />®. Non-Traditional Il~odel - Anon-traditional model would be one that. <br />deviates in someway from the'traditional model and would be defined on <br />a project-by-project basis. This model would offer flexibility and <br />accommodate various local conditions, including the availability, or lack <br />thereof, of land in addition to a school district's needs. <br />This report, outlines the Traditional Model at all levels and provides examples of Non- <br />Traditional Models. The Work Group foresees the need for Non-Traditional Models <br />becoming more prevalent in the future. Furthermore, the Work Group encourages <br />School Boards and County Commissioners to consider non-traditional models as they <br />plan new schools. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.