Orange County NC Website
would be included in the Fee component of a project budget. Other fee <br />costs associated with the Fee component of a project would include on- <br />site engineering control inspections, materials testing (such as concrete, <br />suitable soils), survey, topographic and boundary studies, local <br />government applications and permit fees such as zoning, special use, <br />conditional use and building, connect fees to utilities, and. In addition, <br />costs associated with specialized consultants such as traffic engineers, <br />environmental specialists, and project schedulers/expeditors along with <br />fees charged by North Carolina Caroana eDepartment nofeTransportation <br />Resources (NCDENR), North <br />(NCDOT would be included in the Fee portion of the project budget. <br />Technology Infrastructure <br />The State Department of Public Instruction encourages school systems to <br />install up-to-date technology infrastructure for use by all students, faculty, <br />and staff. When funds are not available for the installation of complete <br />systems, the State recommends that school .systems provide empty <br />conduits and cable trays. rea networks, fipe se ee and othebequipme t <br />space for local and wide a <br />Fiber optic cable may replace wiring closets. This may be a more cost <br />efficient manner to provide connectivity. <br />In addition to infrastructure such as wiring and fiber optics, technology <br />consulting services along with computers, file servers, routers, scanners, <br />printers, telephones, copiers, .facsimiles, video recorders, .televisions, <br />video recorders, cameras and satellite dishes should be included in the <br />technology section of the project budget. Telephone, fire and security <br />systems including surveillance cameras should also be~ included in the <br />Technology section. <br />