Orange County NC Website
~. <br />,. <br />..<.: , '. , dcoff!~y, ..: _ •%26/20Q7 8.36':00 PM ~; <br />.Page 7...I1~ peleted.'. _ :-..` . <br />Hiah School Classrooms (1,000 Student High School Model) <br />• Schools <br />Orange County Standard Facilities <br />Type of Non- Number of Square Foot Per Total Square Foot by Guidelines <br />Specialized Classroom Classrooms Classroom Range Grade Level Range Square Foc <br />Per <br />From To From To <br />•,,,,,Y,~ 22 850 ~ 950 ~ 18,700 I ~u,auu i 750 to 8 <br />'SICaI a7GIC11l:C, <br />logy, Physics <br />4 <br />1,200 <br />1,200 <br />4,800 <br />400 <br />1 <br />4,800 <br />400 <br />1 1,2( <br /> <br />4( <br />1 <br />Science 1 1,400 1,400 , <br />500 <br />1 , <br />500 <br />1 , <br />51 <br />1 <br />~ist 1 1,500 1,500 , , , <br />ry <br />Total Classrooms 28 <br />Storage/Science <br />Prep Rooms 26,400 <br />500 28,600 <br />500 <br />Total Classrooms and Story e S ware Foota a 26,900 29,100 <br />Hiah School Classrooms (1,500 Student High School Model) <br />Type of Non- Number of <br />Specialized Classroom Classrooms <br /> <br />Regular Classrooms 40 <br />Science Classrooms _ <br />Physical Science; <br />Biology, Physics <br />8 <br />Earth Science 1 <br /> <br />Chemist 3 <br />ry <br />Total Classrooms 52 <br />Classrooms <br />Schools <br />Square Foot Per Orange County Standard Facilities <br />Total Square Foot by Guideline <br />Classroom Range Gmde Level Range Square Fa <br />Per <br />From To From o <br />~~n 950 34.000 38,000. 750 to <br />1,200 1,200 9,600 9,600 1,~ <br />1,400 1,400 1,400 1,400 1,' <br />1,500 1,500 4,500 4,500 1,; <br /> 49,500 53,500 <br />;fence Preb Rooms 875 875 <br />3J 26%2D0712.54, OO PM <br />.. Page_16_:'[2] Deleted ~ '`% ~ ;dcoffey '' <br />Fees <br />Fees consist of non-construction costs ("soft costs") related to the direct <br />site and building. Architectural, engineering and construction <br />management services to include educational specifications and <br />programming, schematics and design development, bidding, construction <br />documents, construction administration, reimbursables, furniture selection <br />