Browse
Search
Agenda - 04-30-2007-a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 04-30-2007
>
Agenda - 04-30-2007-a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:29:28 AM
Creation date
8/28/2008 11:41:38 AM
Metadata
Fields
Template:
BOCC
Date
4/30/2007
Document Type
Agenda
Agenda Item
a
Document Relationships
Minutes - 20070430
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
art materials, playground equipment, cafeteria utensils and trays, athletic <br />supplies and equipment (wrestling mats, basketball goals, scoreboards), athletic <br />and band uniforms, custodial cleaning equipment, lawn maintenance equipment, <br />recycling and trash containers, postage machines, specialized equipment such <br />as pianos, and signage. <br />2) Other Considerations <br />-.-- Deleted. ¶ _~ <br />a) High Performance Buildings <br />During the planning process, school districts should give special attention to <br />incorporating fiscally sound energy efficiencies and sustainable green building <br />standards that use renewable/recyclable materials, improve the environment and <br />air quality, and reduce energy usage. Ways to achieve this include: <br />^ Choosing efficient lighting systems and energy management controls <br />^ Incorporating solar orientation, earth integration, and xeriscaping <br />(landscaping with slow-growing, drought tolerant plants to conserve water <br />and reduce trimmings) <br />^ Selecting energy efficient heating, ventilation and air conditioning systems <br />^ Adopting energy alternatives and other conservation measures such as <br />day lighting, water reclamation and reuse systems, water free urinals, <br />photovoltaics, and xeriscaping <br />School systems should analyze life cycle costs of high performance systems to <br />determine their efficiency and sustainability. <br />b) Materials <br />Construction contractors and School district staff should select construction <br />materials based on low maintenance and high durability. The presumed life <br />cycle of new schools is fifty or more years. <br />c) Generator Ready Schools <br />-____-- Formatted: Bullets and Numbering <br />Constructian plans for all future schools should include the facility being. <br />"generator readLr" so that they can serve as emergency shelters as needed. <br />dLOther Considerations <br />..------- Formatted: Bullets and Numbering <br />Other site considerations might include: <br />i) Types of landscaping and buffers at all school sites <br />ii) Installing synthetic playing fields or equipping athletic fields with irrigation <br />systems <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.