Browse
Search
Agenda - 12-10-94 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 12-10-94 BOCC Retreat
>
Agenda - 12-10-94 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2016 2:48:50 PM
Creation date
11/9/2016 8:45:40 AM
Metadata
Fields
Template:
BOCC
Date
12/10/1994
Meeting Type
Special Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. 1.2 Transfer the authority for hiring and firing to the <br /> Principals and Department Heads starting Jan. 1 , 1995. This <br /> will be part of a phase over plan that calls for record keeping <br /> for hiring and firing to be transferred to the school unit in <br /> year two. The current personnel department will have no final <br /> authority over the choices made by the Principals and <br /> Department Heads but will be advised when potential legal or <br /> policy problems may present themselves. The Superintendent <br /> can, of course, override any hiring decision but is expected to <br /> do so on an infrequent and exception basis. <br /> 4.1.3 Provide a budget program for each school to track the <br /> details of the 1994-5 budget on a local school basis. The <br /> budget status can be uploaded to the central AS 400 system <br /> for monitoring during the year. <br /> 4.1 .4 All schools and all departments in central administra- <br /> tion should begin preparing a zero based budget for 1995-6 in <br /> January of 1995. This will require detail information on <br /> spending from the previous year as background information. <br /> The first zero based budget will be Ex personnel and <br /> maintenance but will contain capital budget requests. <br /> 4.1.5 All storerooms will be phased out over the first year. <br /> Current stock will be used as needed and what is left will be <br /> returned to suppliers or sold as needed. By June 30, 1995 all <br /> stockrooms will be closed. . <br /> 4.1.8 .All direct interconnects between the schools and the <br /> central host computer will be put on line in 1994-5. <br /> Interactivity is a requirement for the plan. <br /> 4.1.7 A system architecture plan for the entire information <br /> systems of the school system must be completed in year one <br /> and should begin as soon as possible. This may require the use <br /> of additional personnel or the hiring of an outside consultant <br /> to complete the plan. We suggest the use of volunteer students <br /> from the Kenan-Flagler MBA program at Chapel Hill. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.