Browse
Search
Agenda - 12-05-94 - VIII-I
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 12-05-94 Regular Mtg.
>
Agenda - 12-05-94 - VIII-I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2016 11:30:49 AM
Creation date
11/9/2016 8:24:34 AM
Metadata
Fields
Template:
BOCC
Date
12/5/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> E. Parkland <br /> 1. Cash in the amount of $2,682.00 [($2,407/acre x 39/35 acre)] shall be paid to <br /> Orange County as payment in lieu of parkland dedication. <br /> F. Miscellaneous <br /> 1. The Final Plat shall contain a title block and vicinity map in accordance with <br /> Section V-D-2 and V-D-3 of the Orange County Subdivision Regulations. <br /> 2. Drainage easements shall be provided as indicated on the Preliminary Plan. <br /> 3. A joint driveway agreement shall be prepared for lots 38 and 39 and submitted <br /> with the final plat. <br /> G. Certifications <br /> 1. A Certificate of Survey and Accuracy signed by a registered Land Surveyor <br /> shall be notarized on the face of the Final Plat. <br /> 2. A Certificate of Declaration and Maintenance in the form provided in Section <br /> V-D-6-b of the Orange County Subdivision Regulations signed by the <br /> landowner and developer shall be on the face of the plat and included in a <br /> document describing development restrictions to be recorded concurrently with <br /> the Final Plat. <br /> 3. The Department of Environmental Health shall certify that all residential lots <br /> contain suitable area for septic disposal. <br /> 4. The North Carolina Department of Transportation shall certify that all roads <br /> have been constructed to State standards or that construction plans have been <br /> approved. <br /> 5. A Certificate of Approval signed by the Orange County Planning and <br /> Inspections Department. <br /> Signature of Applicant Clerk to the Board <br /> , accept the above listed conditions of subdivision approval, <br /> and acknowledge that each must be met prior to recordation of the final plat. <br /> Applicant Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.